Site work for a development in La Porte, Indiana. Completed plans call for site work for a development.

Work to be performed includes furnishing all labor, equipment, and materials for the improvement of street, and all other work shown and specified in the Contract Documents. The site of construction is at an existing stormwater pond on Boyd Boulevard, portions of Boyd Boulevard and Lincoln Highway, and Darlington Street, within the City of LaPorte, Indiana. Bids must be on the Bid Form contained in the Specifications. maintaining traffic, lincolnway (sr2), open cut, maintaining traffic, boyd blvd, common excavation, deliver to city site, curb and gutter, concrete, remove and replace, hma patching, type b, hma surface, type b, 9.5 mm, hma intermediate, type b, 19.0 mm, hma base, type b, 25.0 mm, pccp base, patching, concrete patching , mulched seeding, no mow seed mixture, mulched seeding, no mow seed mixture, manhole, type e-4, install only, reventment rip rap on geotextile, watermain, linestop, 18 in. , watermain, connect to existing Each bidder must also complete a Form 96 (as prescribed by the State Board of Accounts); an executed non-collusion affidavit; signed copies of addenda (if issued); a completely executed Affidavit of Compliance with Indiana Immigration Law and Certification of Not Being Engaged in Investment Activities in Iran; and satisfactory bid security as set forth in the Contract Documents. All bids must be accompanied by a certified check or bid bond in the amount of 5% of the Bid. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. The Redevelopment Commission reserves the right to reject any or all bids, or to accept a full or partial award of the bid, which, in its judgment, will be to the best interests of the City of LaPorte. MBE (18.4%), WBE (6.9%) a. Lane Restriction Days: 45 - (On Lincolnway/SR 2) b. Substantial Completion Date: June 30, 2026 - (Completion of all pipe and roadway work) c. Final Completion Date: September 1, 2026

Award

Conservation and Development

$5,349,750.00

Public - City

Site Work

28

5

8

7

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
433
Active Projects
187
Bidding Soon
2,623
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

May 12, 2026

Project location map

Multiple Locations, La Porte, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.