BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work for a water / sewer project in Salem Lakes, Wisconsin. Completed plans call for site work for a water / sewer project.

The work involves the rehabilitation of the sanitary sewer system at Valmar and Yaws Subdivisions. The approximate quantities of work include: installation of 1,100 linear feet of 1-1/4" diameter PVC sanitary force main, 3,000 linear feet of 4" diameter PVC sanitary sewer, 23 horizontal isolation valves, 26 vertical cleanout assemblies, 5 air release assemblies, 97 curb stops with boxes and connections to original service, 97 pre-engineered wetwell/drywell grinder pump stations with panels, 97 electrical and conduit installations, 99 grinder pump system removals, 4,000 linear feet of pipe removal, 4 spot repairs to PVC force main, 1 sanitary manhole rehabilitation, 3 sanitary manhole adjustments, 39,000 square yards of pavement milling, 2,100 cubic yards of excavation, 4,500 tons of crushed aggregate base, 5,600 tons of HMA pavement, 1,100 tons of 3/4" crushed aggregate, 1,100 square feet of concrete walk removal and replacement, 1,050 square feet of concrete drive removal and replacement, 8,600 linear feet of epoxy pavement marking, along with associated construction. Bidders must submit bids electronically via QuestCDN.com, provide a bid bond or certified check for 5% of the bid, file a Bidders Proof of Responsibility Form by the stated deadline, comply with American Iron and Steel Act requirements, and pay not less than prevailing wage rates as established by federal and state authorities. The contract is subject to Equal Employment Opportunity provisions and demonstrates efforts to utilize small, woman-owned, and minority-owned businesses. The Village of Salem Lakes reserves the right to reject or accept bids in its best interest and requires a satisfactory performance bond from each successful bidder. No bid may be withdrawn for 60 days after opening without consent. Disadvantaged business enterprises are encouraged to submit bids. Questions About This Project Please Contact: Dave R. Reiter, P.E. Salem Lakes Village Engineer At Rasmith Office: 262-317-3201 dave.reiter@rasmith.com and Brandon a. Foss, P.E. Senior Project Manager at Rasmith Office: 262-317-3374 brandon.foss@rasmith.com

Bid Results

Water / Sewer

$6,981,100.00

Public - City

Site Work

38

14

8

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
4
Bidding Soon
2,803
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2026

May 1, 2026

Project location map

11252 254th Ct, Salem Lakes, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.