BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 9, 2026 at 8:00 PM

Updated March 11, 2026

Renovation of a fitness / recreation center in Lake Orion, Michigan. Completed plans call for the renovation of a fitness / recreation center.

Reference Number 0000413452 Question Acceptance Orion Township Parks and Recreation is seeking a cost to supply and install a 500 kW Kohler Natural Gas Generator with a 480 Volt, 3-phase system to ensure a fully operational backup power solution for the Orion Recreation Center (3800 S. Baldwin Rd. Lake Orion, MI 48359) Specifications 1. Generator and Transfer Switch Installation: a. Generator Location: The generator will be installed on the south side of the building, west of the current transfer. b. Transfer Switch: A 1600-amp automatic transfer switch will need to be installed, mounted outside the electrical powerhouse room. c. Concrete Pads: Both the generator and transfer switch will be placed on poured concrete pads, adhering to all specifications. Installation of concrete pads must be included in the proposal. Installation of concrete pads and the transfer switch can begin when weather permits. 2. Underground Electrical Work: a. Electrical work will involve trenching and/ or boring from the transformer to the transfer switch and from the generator to the transfer switch, all conducted safely with coordination with Miss Dig and local utilities to code. 3. Gas Line Installation: a. The gas line will be installed underground, requiring coordination with state code and Miss Dig to ensure safety and compliance. 4. Crane Services: a. A 50,000 LB crane will need to be utilized for the placement of the generator, which much be included in the proposal. 5. Permits and Engineering: a. All necessary permits will be required for this project. The bidder must handle the application and procurement of these permits, as well as any engineered drawings required. b. Permit cost must be included in the bidder's proposal. 6. Timeline: a. Bidders must clearly define the timeline and schedule for the project once approved. b. Electrical shutdowns must be coordinated in advance and must occur after general center operations (9:00 p.m.). 7. Training a. Required training and start-up load testing 8. Warranty a. Define warranty and/ or service period covered under purchase Question Deadline 03/04/2026 at 4:30 PM ET Questions are submitted online No, Please direct procedural questions regarding this RFQ to the Clerk's Office Please direct technical questions regarding this RFQ to Tyler Light 248-391-0304 ext. 3507 tlight@oriontownship.org or Aaron Whatley 248-391-0304 ext. 3501 awhatley@oriontownship.org Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Installation Required - Insurance Required - License Required - Training Required - Warranty Information Required Potential Award April 6, 2026 The Township reserves the right to reject any or all quotes or any part of a quote. The Township reserves the right to reject the quote of any bidder that previously failed to perform adequately for the Township or any other governmental agency. The Township expressly reserves the right to reject the quote of any bidder who is in default on the payment of taxes, licenses or other monies due to the Township

Post-Bid

Fitness / Rec Centers

$400,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

April 9, 2026

Project location map

3800 S Baldwin Rd, Lake Orion, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.