Published April 18, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a mixed-use development in Boise, Idaho. Completed plans call for site work for a detention facility; and water / sewer project.

The Work of the Project is defined by the Contract Documents and consists of the following 1. Project consists of work as shown and specified but not limited to the removal and replacement of existing galvanized domestic cold, hot, and hot water recirculation piping, replacement of selected water heaters, replacement of tempering valve with new tempering valve, associated electrical, demolition of existing piping, materials, not reused, insulation removal and replacement, etc. as shown. 2. Wall/ceiling removal and replacement including patching, and painting (paint provide by owner), shall be done by the contractor and included in their bid. 3. The contractor shall coordinate all work with Ada County. Scheduling of work shall be done in concert with County personnel and user. No work shall be done without approval of schedule by Owner. 4. All work shall be in compliance with current adopted IBC, IMC, ISPC, IEC and NEC, as well as all State and County requirements. 5. Once equipment is onsite, Contractor shall coordinate and schedule work with County. Demolish existing components and install system with existing to remain operational as much as possible. Install new tempering station, electrical and controls, etc., as shown. Coordinate with existing conditions and Owner. 6. Schedule minimal shutdown of existing systems for water with Owner a minimum of 1 week prior to shutdown and perform shutdowns at night to minimize effect on facility. B. Type of Contract 1. Project will be constructed under a single prime contract. The Work to be included in the Construction Contract is generally described as providing all labor and materials necessary for the removal and replacement of water lines and a water heater at the Ada County Juvenile Services facility, which will include removal of existing galvanized piping, replacement with new copper piping, and installation of a new water heater and mixing valve, all as more specifically detailed in the Project Manual specifications and drawings (the "Project"). The contractor will be responsible for all necessary access (wall/ceiling cuts) and subsequent repairs to return the facility to its original condition. Question Deadline 03/06/2026 at 4:00 PM MT Any and all questions, substitution requests, requests for clarification, or explanations desired by potential Bidders must be submitted in the Vendor Discussions section of the Online.

Award

Jails / Prisons

$144,000.00

Public - County

Site Work

9

11

11

7

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
27
Bidding Soon
401
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

April 16, 2026

Project location map

6300 W Denton St, Boise, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.