Published April 23, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a mixed-use development in Marshall, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of April 23rd, 2026, the project was awarded to R and G Construction Co, with an awarded amount of $918,005.65** This Project Consists of: Reconstruction and Utility Replacement on North High Street From North 4th Street to Oak Street, and Sanitary Sewer Replacement in the Alley Between North 5th Street to North 6th Street. All Utilities Will Be Replaced, Including Watermain, Sanitary Sewer, and Storm Sewer Within the Areas Identified Above. This Project Will Include New Water and Sewer Services to the Right-of-way. Other Items of Work Included in This Project Are Pavement Removal, Aggregate Base, Bituminous Surfacing, Concrete Driveways, Sidewalks, Curb and Gutter and Other Minor Work. Estimated Quantities of Major Work Items for the Project Are as Follows: Item Quantity Unit Item Quantity Unit Common Excavation (P) 2,460 Cy 6" Pvc Watermain 990 Lf Aggregate Base, (Cv) Class V (P) 2,025 Cy 15" Rc Pipe Sewer, Class Iii 700 Lf Type Sp 9.5 Wearing Course Mix (3,c) 1,170 Ton 4" Concrete Walk 8,313 Sf 8" Pvc Pipe Sewer 809 Lf 6" Concrete Walk 1,743 Sf 1" Water Service Complete 16 Each Concrete Curb & Gutter Design B618 2,851 Lf All Bidders Are Required to Become Acquainted With the Extent of the Work and the Conditions Under Which the Work Will Be Performed. All Bids Shall Be Made Electronically via online and Shall Be Accompanied by a Cash Deposit, Cashier's Check, Bid Bond or Certified Check, Payable to the Order of the City for Not Less Than 10% of the Bid. The City Council Reserves the Right to Reject Any or All Bids or Any Part of Any Bid, to Waive Minor Defects, Technicalities, or Any Informalities in the Bidding or to Advertise for New Proposals, and to Accept That Bid Deemed to Be in the City's Best Interest. No Bidder May Withdraw His Bid for at Least 30 Days After the Scheduled Closing Time for the Receipt of Bids. High Street and Alley Reconstruction High Street from North Fourth Street to Oak Street Alley from North Fifth Street to North Sixth Street Questions regarding this Project, including any questions prior to bidding, shall be directed to Eric Hanson, Assistant City Engineer, at (507) 537-6773 or Eric.Hanson@ci.marshall.mn.us.

Award

Roads / Highways

$918,006.00

Public - City

Paving, Site Work

33

11

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
42
Bidding Soon
566
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

May 15, 2026

Project location map

N High St, Marshall, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.