BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2026 at 8:00 PM

Updated June 10, 2026

Site work and paving for a civil project in Porterdale, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Geo-Hydro Project Number 261498.10 The work completed shall consist of paving approximately 25,000 square yards of asphalt roadway complete with 1.5" of asphalt overlay, transition milling, striping, manhole risers, removing and replacing road base, and all appurtenances necessary for a complete installation. The Work shall be completed in Spring 2026, but the exact start date and time allotted for completion shall be provided by the Bidder. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. Owner reserves the right to reject any or all Proposals, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Proposals and to reject the Proposal of any Proponent if Owner believes that it would not be in the best interest of the Project to make an award to that Proponent, whether because the Proposal is not responsive or the Proponent is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Nansbrook Subdivision a) Edge mill and overlay Austin Terrace b) Edge mill and overlay Kevin Court c) Edge mill and overlay Paula Drive d) Edge mill and overlay Madison Way e) Edge mill and overlay Daniel Lane f) Edge mill and overlay Blake Avenue g) Overlay A Alley h) Overlay B Alley i) Overlay C Alley j) Overlay D Alley k) Overlay E Alley l) Overlay F Alley m) Overlay E Alley 2. Worthington Woods Subdivision: a) Replace road base and overlay Wynfield Drive b) Replace road base and overlay Maple Court c) Replace road base and overlay Oakmont Court d) Replace road base and overlay Weldon Place 3. Edge mill and overlay Magan Court 4. Michael Ryan Drive a) Edge mill and overlay existing pavement b) Replace gravel road with full depth road construction from the end of existing pavement to Cedar Street 5. Where there is curb and gutter, contractor shall edge mill existing pavement as necessary to ensure the proposed overlay ties into the existing gutter. 6. Contractor shall transition mill all side streets and driveways as necessary to not introduce an elevation change. 7. Contractor shall adjust manhole rims as necessary to maintain a smooth road surface. 8. Contractor shall remove and replace speed bumps as necessary for installation. 9. Contractor shall preserve any elevation change between driveways and roadway so as to not allow water to enter a driveway from the roadway. 10. Contractor shall preserve the existing characteristics of the road. (e.g. camber, superelevation, valley, etc.) 11. Contractor shall stripe roadway as necessary to match existing striping. 12. Overlay paving shall be 1.5" thick 9.5mm Superpave. 13. Sod or Hydroseed disturbed areas to match existing grassing. Vehicular access for emergency services shall be maintained at all times. Contractor shall coordinate traffic control accordingly. Questions can be submitted until 1 week prior to the RFP due date .

Award

Roads / Highways

$548,428.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

18

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
145
Bidding Soon
2,336
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

June 18, 2026

Project location map

Multiple Locations, Porterdale, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.