BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work, paving and renovation of a civil project in Brookline, Vermont. Completed plans call for the demolition of a bridge / tunnel; and bridge / tunnel.

This is a request for proposal to restore (repair and mitigate) the stone arch bridge structure number 66-11 of Brookline, VT Culvert Inventory Map. The scope of work includes: closing down the road for job completion, removing pavement, removing guard rails, dismantling and resetting the downstream end of the stone wing walls, opening and resetting the middle section of the stone arch (specifically the south side middle section), dismantling the upstream end of the wing walls, mitigating erosion behind the dry stone wing walls by installing water barrier materials and resetting, providing mitigation as needed at the upstream end of the cement culvert including additional cement installation to address erosion under the cement culvert section, and finally restoring the road with new pavement and installing steel backed timber guardrails that outspan the arch structure, restoring the road to full working condition. Bidders are instructed to attend a meeting and site visit on March 10 at 11:30 AM at Town Hall (734 Grassy Brook Road) with a site visit to immediately follow. Bids must be received at Town Hall by no later than 2:00 PM on March 30, 2026. All work must be completed by September 15, 2026. This is a FEMA funded project and all bidders must meet applicable FEMA requirements for bidding, contract terms, work completion, and final project close out. The Town Selectboard reserves the right to reject any and all bids for any reason at its sole discretion. Bidders should contact Everett Hammond (engineer) at (802)-376-0042 or hammondeng@gmail.com to request a copy of the full RFP, ask any questions, and confirm attendance at the March 10 meeting.

Post-Bid

Bridges / Tunnels

$20,000.00

Public - City

Demolition, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
600
Active Projects
357
Bidding Soon
3,620
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2026

May 14, 2026

Project location map

Hill Road, Brookline, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.