Preview Active Commercial Construction Projects Like This One
Get preview access now-no credit card required.
Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 19, 2026 at 8:00 PM
Updated March 20, 2026
Demolition and site work for a military facility in Tyndall AFB, Florida. Working plans call for the demolition of a military facility; and for site work for a military facility.
"As per the Owner the Project has been cancelled. Editorial Content Team is actively seeking updated information" Cancellation Description The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined by the Statement of Work (SOW). The performed tasks shallbe based on the project description, other data furnished in SOW, and information covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization. The SOW sets forth the requirements for a Request for Proposal (RFP) contract site specific demolition of 6 buildings/facilities located on Tyndall AFB, Florida. The Contractor shall adhere to the following guidance during construction phase(s) of this project: Unified Facilities Criteria (UFC) 3-250-01, UFC 3-250-03, UFC 3-600-01, United States Army Corps of Engineers, Uniform Building Code (UBC), those sections of the Southern Standard Building Codes not incorporated in the UBC/International Building Code (IBC) for our respective area, Air Force Standards, Department of Defense (DOD) Directives, Florida State Statutes, Florida Department of Transportation (FDOT), the Tyndall AFB Facility Excellence Plan (Base Regulations), National Electric Code (NEC), Occupational Safety and Health Administration (OSHA) Requirements, Department of Environmental Protection (DEP) Regulations, Environmental Protection Agency (EPA) Regulations, and any related Americans with Disabilities Act (ADA) Compliance Requirements. If there is a conflict between these codes, regulations and specifications, the most stringent requirements shall apply at all times. Documents listed by and/or provided by the Government are for reference only and do not relieve the Contractor from adherence with applicable codes not specifically addressed. The contractor shall also perform the required services in accordance with the SOW, applicable Construction Wage Rate, and all other contract terms and conditions. Demolition services required for five buildings and facilities, including all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined in the Statement of Work. Work shall be based on the project description, data furnished in the SOW, and information provided during the pre-construction or criteria review meeting prior to mobilization. All demolition activities shall comply with Unified Facilities Criteria 3-250-01, 3-250-03, and 3-600-01, United States Army Corps of Engineers requirements, Uniform Building Code, applicable portions of the Southern Standard Building Codes not incorporated into the UBC or International Building Code, Air Force Standards, Department of Defense directives, Florida State Statutes, Florida Department of Transportation requirements, Tyndall Air Force Base Facility Excellence Plan, National Electric Code, OSHA requirements, Department of Environmental Protection regulations, Environmental Protection Agency regulations, and any relevant Americans with Disabilities Act compliance requirements. In the event of conflicts among codes or regulations, the most stringent requirements apply. All services shall be performed in accordance with the SOW, applicable Construction Wage Rate, contract terms and conditions, and current federal and state regulations. Location: Tyndall Air Force Base, 445 Suwannee Rd, Panama City, FL 32403. The Method of Contractor Selection has not been determined at this Time. the magnitude for this project is between $500,000 and $1,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Military
$1,000,000.00
Public - Federal
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 14, 2026
Multiple Locations, Tyndall AFB, FL
Related To This Project
Tyndall AFB, FL
Bid Date: Mar 11 2026
Tyndall AFB, FL
--
Tyndall AFB, FL
Bid Date: Apr 08 2026
Tyndall AFB, FL
Bid Date: Feb 23 2026
Tyndall AFB, FL
--
Tyndall AFB, FL
Bid Date: Apr 08 2026
Tyndall AFB, FL
Bid Date: Feb 06 2026
Tyndall AFB, FL
--
Tyndall AFB, FL
Bid Date: Sep 17 2025
Tyndall AFB, FL
Bid Date: Sep 04 2025
Tyndall AFB, FL
--
Tyndall AFB, FL
Bid Date: Aug 29 2025
Tyndall AFB, FL
Bid Date: Aug 01 2025
Tyndall AFB, FL
--
Tyndall AFB, FL
Bid Date: Jul 03 2025
