Published March 19, 2026 at 8:00 PM

Updated March 20, 2026

Demolition and site work for a military facility in Tyndall AFB, Florida. Working plans call for the demolition of a military facility; and for site work for a military facility.

"As per the Owner the Project has been cancelled. Editorial Content Team is actively seeking updated information" Cancellation Description The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined by the Statement of Work (SOW). The performed tasks shallbe based on the project description, other data furnished in SOW, and information covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization. The SOW sets forth the requirements for a Request for Proposal (RFP) contract site specific demolition of 6 buildings/facilities located on Tyndall AFB, Florida. The Contractor shall adhere to the following guidance during construction phase(s) of this project: Unified Facilities Criteria (UFC) 3-250-01, UFC 3-250-03, UFC 3-600-01, United States Army Corps of Engineers, Uniform Building Code (UBC), those sections of the Southern Standard Building Codes not incorporated in the UBC/International Building Code (IBC) for our respective area, Air Force Standards, Department of Defense (DOD) Directives, Florida State Statutes, Florida Department of Transportation (FDOT), the Tyndall AFB Facility Excellence Plan (Base Regulations), National Electric Code (NEC), Occupational Safety and Health Administration (OSHA) Requirements, Department of Environmental Protection (DEP) Regulations, Environmental Protection Agency (EPA) Regulations, and any related Americans with Disabilities Act (ADA) Compliance Requirements. If there is a conflict between these codes, regulations and specifications, the most stringent requirements shall apply at all times. Documents listed by and/or provided by the Government are for reference only and do not relieve the Contractor from adherence with applicable codes not specifically addressed. The contractor shall also perform the required services in accordance with the SOW, applicable Construction Wage Rate, and all other contract terms and conditions. Demolition services required for five buildings and facilities, including all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined in the Statement of Work. Work shall be based on the project description, data furnished in the SOW, and information provided during the pre-construction or criteria review meeting prior to mobilization. All demolition activities shall comply with Unified Facilities Criteria 3-250-01, 3-250-03, and 3-600-01, United States Army Corps of Engineers requirements, Uniform Building Code, applicable portions of the Southern Standard Building Codes not incorporated into the UBC or International Building Code, Air Force Standards, Department of Defense directives, Florida State Statutes, Florida Department of Transportation requirements, Tyndall Air Force Base Facility Excellence Plan, National Electric Code, OSHA requirements, Department of Environmental Protection regulations, Environmental Protection Agency regulations, and any relevant Americans with Disabilities Act compliance requirements. In the event of conflicts among codes or regulations, the most stringent requirements apply. All services shall be performed in accordance with the SOW, applicable Construction Wage Rate, contract terms and conditions, and current federal and state regulations. Location: Tyndall Air Force Base, 445 Suwannee Rd, Panama City, FL 32403. The Method of Contractor Selection has not been determined at this Time. the magnitude for this project is between $500,000 and $1,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Military

$1,000,000.00

Public - Federal

Demolition, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
31
Bidding Soon
414
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2026

Project location map

Multiple Locations, Tyndall AFB, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.