BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 16, 2026 at 8:00 PM

Updated March 25, 2026

Site work, paving and new construction of a mixed-use development in Priest River, Idaho. Completed plans call for the construction of a 2,025-square-foot transportation facility; for site work for a transportation facility; water / sewer project; road / highway; and for paving for a road / highway.

Question Deadline 03/18/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows Corrie Esvelt-Siegford at (208)762-3644 or via email at csiegford@ardurra.com. Questions must be received by the end of day. Snow Removal Equipment Building consists of all elements necessary to construct a preengineered metal building for storage of the airport's snow removal equipment. Work generally consists of the construction of a Snow Removal Equipment Building (approximate gross size 2,025 sft) with associated utility extensions, and vehicle access to roadway. Work includes sitework to construct the new building to include surveying, erosion control, excavation, embankment, base course, asphalt paving, stormwater modifications and improvements, utility work, topsoil, seeding and other miscellaneous items. Building items include permitting, foundation and floor concrete, wood or steel framing and erection of trusses, insulation, overhead and man doors, HVAC, roofing, and electrical. Work associated with proposed improvements is generally described as follows: Base Bid Schedule A: Snow Removal Equipment (SRE) Building; Additive Alt Schedule B: Concrete Floor and Sewer Service; Additive Alt Schedule C: Paved Approach and Access; Additive Alt Schedule D: Water Service Improvements. Snow Removal Equipment Building consists of all elements necessary to construct a pre-engineered metal building for storage of the airport's snow removal equipment. Work generally consists of the construction of a Snow Removal Equipment Building (approximate gross size 2,025 sft) with associated utility extensions, and vehicle access to roadway. Work includes sitework to construct the new building to include: surveying, erosion control, excavation, embankment, base course, asphalt paving, stormwater modifications and improvements, utility work, topsoil, seeding and other miscellaneous items. Building items include permitting, foundation and floor concrete, wood or steel framing and erection of trusses, insulation, overhead and man doors, HVAC, roofing, and electrical. Est. Completion Date: April 15, 2027

Post-Bid

Transportation Terminals

$700,000.00

Public - County

New Construction, Paving, Site Work

10

16

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
20
Bidding Soon
226
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

April 23, 2026

Project location map

102 Airfield Way, Priest River, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.