Published April 23, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a sidewalk / parking lot in San Rafael, California. Completed plans call for site work for a sidewalk / parking lot.

The project will include pathway improvements to current Americans with Disabilities Act (ADA) standards on each end of the pedestrian bridge at McGlashan Pathway. McGlashan Pathway is heavily used and must remain open during daytime hours. All construction activities shall be conducted during nighttime hours, and the contractor shall ensure that the pathway remains fully accessible to the public during daytime hours. The Contractor shall possess a valid Class "A" License at time of bid submittal. To bid on this Project, the Bidder and all subcontractors are required to be registered as a public works contractor with the Department of Industrial Relations pursuant to the Labor Code. The Bidder's and all subcontractors' registration must remain active throughout the term of the Contract. A Bid Bond, cash, certified check, or cashier's check, in the amount of 10% of the total bid amount payable to the County of Marin shall accompany the Proposal. The Board of Supervisors of the County of Marin reserves the right to reject any or all bids and the right to waive any irregularities. Award of contract, if awarded, will be to the lowest responsible bidder whose proposal complies with prescribed requirements, and will be within sixty (60) days after the date of the Bid Opening. The County may extend the specified award period if the Bidder agrees. If the Bidder does not receive a request to extend the bid date, or receives a request but does not accept a County request to extend the bid date, before 4:00 on the last day of the award period: 1. Your bid becomes invalid 2. You are not eligible for the award of the contract. At the successful Contractor's option, securities may be substituted for the required retention, in accordance with the provisions of Section 22300 of the State of California Public Contract Code. Pursuant to Public Contract Code Sections 7201 and 9203, the County of Marin shall retain 5 percent of the contract price until final completion and acceptance of the project. There is no pre-bid meeting scheduled for this project. Questions concerning the Bid should be submitted via online no later than 5 p.m. on Wednesday, March 18th, 2026. Inquiries or questions based on alleged patent ambiguity of the plans, specifications or estimate must be communicated as a bidder inquiry prior to bid opening. Bidder must visit the work site before submitting a bid. Bidder shall thoroughly investigate the conditions which will be encountered in the project including, but not limited to, existing retaining wall, existing underground and overhead utilities, existing structures at the private property, road width, space needed to flag traffic, existing Asphalt Concrete and Concrete Paver conditions, staging, pedestrian access, detouring, and site access challenges. This contract is subject to state contract nondiscrimination and compliance requirements pursuant to Government Code, Section 12990. This is a public works contract subject to the provisions of Part 7 of Division 2 of the California Labor Code (Sections 1720 et seq.). In accordance with Labor Code Section 1771, Contractor and all subcontractors shall pay not less than current prevailing wage rates as determined by the California Department of Industrial Relations ("DIR") to all workers employed on this project. Pursuant to Section 1773 of the California Labor Code, the general prevailing wage rates for Marin County where the work is to be done have been determined by DIR. In accordance with Labor Code Section 1815, Contractor and all subcontractors shall pay all workers employed on this project 1 1/2 the basic rate of pay for work performed in excess of specified hour limitations. The work performed pursuant to this agreement is subject to compliance monitoring and enforcement by the Department of Industrial Relations. California Labor Code Sections 1777.1, 1775, and 1813, describe potential penalties contractors or subcontractors may be subject to for failure to comply with the prevailing wage law. Equipment rental rates as determined by the State of California are listed in the Department of Transportation publication entitled "Labor Surcharges and Equipment Rental Rates," issued semi-monthly. The Performance Bond shall be in an amount equal to one hundred percent (100%) of the total amount bid by the Contractor in their proposal. The Payment Bond shall be in an amount equal to one hundred percent (100%) of the total amount bid by the Contractor in their proposal.

Bid Results

Sidewalks / Parking Lot

$68,150.00

Public - County

Site Work

6

6

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
497
Active Projects
267
Bidding Soon
3,589
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

April 23, 2026

Project location map

McGlashan Pathway, San Rafael, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.