Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 26, 2026 at 8:00 PM
Updated May 27, 2026
Renovation of an elderly care / assisted living facility in King, Wisconsin. Completed plans call for the renovation of a four-story above grade elderly care / assisted living facility.
The bidder is responsible for the sealed bid being delivered to the indicated location or submitted via the eBuilder 45 Bid Portal before the time specified for the bid submission. Third party delivery is entirely at the bidder's risk. In general, the work consists of the removal and replacement of patient lifts within Member/Resident rooms and 2 spa/bathing rooms within Moses Hall, which is an existing four-story concrete, steel and masonry building. Work 3 includes selective demolition of ceilings, walls, and door frames, removal of existing patient lifts and ceiling tracks, 4 installation of new patient lifts and track system, installation of privacy curtains, and patching and re-finishing of 5 ceilings, walls, and door frames affected by the work. Mechanical work will be limited to relocation of diffusers as 6 needed to accommodate new lift tracks. Electrical work will include relocation of light fixtures as needed and power 7 connection to new lift system. The project also includes installing a new patient lift in the physical therapy room. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Contract offer and construction phase records will be processed electronically via eBuilder. The application of the 5% permissive bidding preference pursuant to Wis. Stat. 16.855(10m)(am)3. for 36 certified minority businesses is currently paused. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. No verbal explanation or instructions will be given in regard to the meaning of the drawings or specifications during the bid period. Bidders shall bring inadequacies, omissions or conflicts to the Architect/Engineer's attention at least ten (10) days before MEP bidding commences.
GC Bidding
Elderly Care / Assisted Living
$2,380,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2026
January 4, 2027
N 2665 COUNTY RD QQ, King, WI
Related To This Project
King, WI
Bid Date: Apr 29 2026
King, WI
Bid Date: Jul 09 2026
King, WI
Bid Date: Jan 06 2026
King, WI
Bid Date: Oct 29 2025
King, WI
Bid Date: Jul 02 2025
King, WI
Bid Date: Mar 05 2025
King, WI
Bid Date: Feb 08 2024
Menomonie, WI
Bid Date: Mar 26 2026
Madison, WI
Bid Date: Mar 17 2026
Madison, WI
Bid Date: Mar 17 2026
Mondovi, WI
Bid Date: Mar 18 2026
Spencer, WI
Bid Date: Mar 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
