BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Florissant, Missouri. Completed plans call for site work for a educational facility; and for paving for a educational facility.

Reference Number 0000415126 Question Deadline 04/02/2026 at 12:00 PM CT Questions are submitted online Yes Any questions regarding the specifications are to be directed to Danielle Thomas, Director of Purchasing & Supplier Diversity The Hazelwood School District is seeking bid proposals for asphalt replacement at The Learning Center, Coldwater Elementary, West High, Northwest Middle, Opportunity Center, and East High School. 15955 New Halls Ferry Road, Florissant 63031 Two (2) inch mill and overlay o The area under consideration for new asphalt surface comprises approximately eight thousand four hundred (8400) square yards (contractor is responsible for measurements) see map labeled Administration o Sawcut and remove up to a six (6) six (6) foot perimeter around three (3) area drains. o Excavate around perimeter, eighteen (18) inches deep. o Pour back eighteen (18) inch wide, eighteen (18) inch thick concrete collar. o Install new grates inlet frames. o Grout/re-install brick as needed. o Rotomill existing asphalt pavement full width to a depth of two (2) inches. o Remove all milling debris from job site. o Clean loose material and vegetation from area to be paved. o Prime with ss-1 primer. o Overlay area with approximately two (2) inches of hot surface mix asphalt, blending and tapering where necessary. o Roll asphalt to proper compactio!1_ with steel drum vibratory roller. o All areas will be barricaded before;:'auring and after this project. o Install two (2) new speed bumps in existing locations o Layout and paint new pavement with one (1) coat of traffic marking paint per existing layout. o Install all wheel stops per existing layout o Work must be completed between July 1, 2026, and August 1, 2026 Coldwater Elementary 1105 Weishaupt Road Florissant 63031 Two (2) inch mill and overlay o The area under consideration for new asphalt surface comprises approximately three thousand seven hundred fifty (3750) square yards (contractor is responsible for measurements) see map labeled Coldwater o Rotomill existing asphalt pavement full width to a depth of two (2) inches. o Remove all milling debris from job site. o Clean loose material and vegetation from area to be paved. o Prime with ss-1 primer. o Overlay area with approximately two (2) inches of hot surface mix asphalt, blending and tapering where necessary. o Roll asphalt to proper compaction with steel drum vibratory roller. o All areas will be barricaded before, during and after this project. o Layout and paint new pavement with one (1) coat of traffic marking paint per existing layout. o Install all wheel stops as necessary. West High School 1 Wildcat Lane Hazelwood 63042 Remove and Replace Porous Asphalt o The area under consideration for porous asphalt removal and replacement comprises approximately three thousand three hundred fifty (3350) square yards (contractor is responsible for measurements) see labeled West HS o Install all wheel stops as necessary o Excavate repair areas to a depth of four (4) inches. o Haul away all materials from site. o Install four (4) inches of hot porous mix asphalt. o Blend and taper where necessary o Roll to proper compaction o All areas will be barricaded before, during and after this project. o Layout and paint new pavement with one (1) coat of traffic marking paint per existing layout. Northwest Middle School 1605 Shackelford Road Florissant 63031 Remove and Replace Porous Asphalt o The area under consideration for porous asphalt removal and replacement comprises approximately two thousand four hundred fifty (2450) square yards (contractor is responsible for measurements) see page labeled NW Middle o Excavate repair areas to a depth of four (4) inches. o Haul away all materials from site. o Install four (4) inches of hot porous mix asphalt. o Blend and taper where necessary o Roll to proper compaction o All areas will be barricaded before, during and after this project. o Layout and paint new pavement with one (1) coat of traffic marking paint per existing layout. o Install all wheel stops as necessary o Work must be completed between July 1, 2026, and August 1, 2026 Opportunity Center 1865 Dunn Road St Louis 63138 New ten (10) foot wide Asphalt Path to Bathrooms o The area under consideration for new asphalt surface comprises approximately three hundred (300) square yards (contractor is responsible for measurements) see page labeled Opportunity Center o Evacuate proposed area to a depth or nine (9) inches below finished elevation. o Install new culvert with rip rap for proper drainage under new path. o Install six (6) inches of crushed gravel and compact with a steel drum vibratory roller. o Install three (3) inches compacted thickness surface asphalt and compact with steel roller. o Backfill new path as needed. o Coordinate with Director of Maintenance on a start date. Hazelwood East High School 11300 Dunn Road St. Louis 63138 New five (5) foot wide Asphalt Path to Tennis Court o The area under consideration for new asphalt surface comprises approximately one hundred fifty (150) square yards (contractor is responsible for measurements) see page labeled Hazelwood East o Evacuate proposed area to a depth or nine (9) inches below finished elevation. o Install new culvert with rip rap for proper drainage under new path. o Install six (6) inches of crushed gravel and compact with a steel drum vibratory roller. o Install three (3) inches compacted thickness surface asphalt and compact with steel roller. o Backfill new path as needed. o Coordinate with Director of Maintenance on a start date.

Award

Educational

$549,546.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2026

July 1, 2026

Project location map

Multiple Locations, Florissant, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.