Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 16, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a civil project in Crossfield, Alberta. Completed plans call for site work for a water / sewer project.
The Town of Crossfield invites proponents to submit proposals for the construction of the 2026 Laut Avenue - Water & Wastewater main replacement & Bulk water station improvements. The base scope of the work includes sanitary sewer and water main replacement along with all associated rehabilitation works within the project limits along Laut Avenue, as well as surface improvements for Bulk Water Station: 1. Removal of existing 300mm sanitary sewer and installation of approximately 450m of new 750mm diameter sanitary sewer main. All existing sanitary manholes located within the limits of construction shall be removed and replaced with new manhole structures that conform to current City of Calgary standards and design requirements. 2. Sanitary service connections from adjacent properties that tie into the affected sewer main shall be replaced from the main to the property line. The Contractor shall provide, operate, and maintain all required temporary sanitary bypass systems to ensure uninterrupted sanitary service throughout all construction activities. 3. Removal of existing 250mm watermain and installation of approximately 480m of new 400mm diameter water main. All valves, fittings, thrust blocks, joint restraints and connections shall be installed as per City of Calgary standards. 4. New fire hydrants and associated appurtenances shall be supplied and installed in accordance with City of Calgary requirements. All valves, fittings, thrust blocks and connections shall be installed as per City of Calgary standards. 5. Water Services Connections involve the removal and replacement of existing water service connections. The scope includes excavation, installation of new service lines and fittings, thrust blocks, testing and restoration of disturbed areas. All work must comply with City of Calgary standards and be performed by qualified personnel. Temporary water services must be maintained when undertaking this work. 6. Surface restoration includes the full removal and reconstruction of asphalt pavement and granular base. Concrete curbs, gutters, and sidewalks impacted by the work shall be removed and reinstated to match existing alignments and profiles. 7. All disturbed areas, including commercial driveways and landscaped surfaces shall be restored to their original condition or better. Materials and methods shall comply with municipal restoration standards. 8. Work at the Bulk Water Station includes removing and replacing the existing curb within the construction limits (as indicated in the drawings), asphalt pavement within the project area, and installing a new concrete slab with protective bollards. Existing services including RV dump inlets, water hose connections, and other utilities located within this concrete slab should be adjusted or reconnected to match new surface elevations. In addition, the Contractor shall remove and replace two twin catch basins, connect them to the existing storm system, install new standard curb, and repave the adjacent gutter to ensure proper drainage. Throughout construction, the Contractor shall maintain a minimum of one operational traffic lane on Laut Avenue at all times to ensure uninterrupted traffic and general vehicle movement. Traffic management measures shall be planned and implemented to maintain business access with minimal disruption. A temporary water supply plan must be provided to ensure uninterrupted service to all active businesses within the project area. The Contractor shall provide, operate, and maintain a temporary sanitary bypass systems required to ensure uninterrupted sanitary service throughout the duration of construction activities. Question Deadline 03/19/2026 at 2:00 PM MT
Award
Water / Sewer
$3,938,064.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2026
May 1, 2026
Laut Ave, Crossfield, AB
Related To This Project
Crossfield, AB
--
Crossfield, AB
--
Crossfield, AB
Bid Date: Feb 06 2026
Crossfield, AB
--
Crossfield, AB
Bid Date: Sep 19 2025
Crossfield, AB
--
Crossfield, AB
Bid Date: Aug 29 2025
RFP Contractor - 2025 Sanitary Main Replacement - Athabasca Crescent & Saskatchewan Street - 5867557
Crossfield, AB
Bid Date: Aug 29 2025
Crossfield, AB
Bid Date: Aug 19 2025
Crossfield, AB
Bid Date: Jul 24 2025
Crossfield, AB
Bid Date: Apr 15 2026
Crossfield, AB
Bid Date: May 01 2025
Crossfield, AB
--
Crossfield, AB
Bid Date: Mar 27 2025
Crossfield, AB
Bid Date: Apr 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
