BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2026 at 8:00 PM

Updated April 4, 2026

Site work for a water / sewer project in Oxford, Wisconsin. Completed plans call for site work for a water / sewer project.

Restoring the existing wastewater aerator drive assembly that supports the facility's wastewater treatment system, including providing all necessary equipment, labor, materials, and incidentals required to return the system to proper working condition in accordance with the solicitation and performance requirements. Location: Federal Correctional Institution Oxford, County Road G & Elk Avenue, Oxford, WI 53952 The Federal Bureau of Prisons (FBOP), Federal Correctional Institution, located at County Road G & Elk Avenue, Oxford, Wisconsin 53952 intends to make a single award to a responsible entity that will restore the existing wastewater aerator drive assembly serving the facility's wastewater treatment system. 1. The contractor shall furnish all parts, labor, supervision, tools, equipment, transportation, and incidentals necessary to restore the existing aerator motor, gear drive, and bearing assemblies to proper operating condition to ensure reliable aeration performance and continued wastewater treatment operations. The contractor shall provide repair and installation services as required for the existing aeration equipment utilizing Manufacturer: Magna Rotor, Model: 14" JG Magna Rotor 13, Serial Number: 03115 or approve equal. All work shall be performed in accordance with the manufacturer specifications, installation requirements, and industry best practices to ensure proper mechanical operation, aeriation efficiency, and system reliability. All materials, parts, and workmanship shall meet or exceed the salient characteristics of the existing equipment manufacture's design. a) Motor Replacement o Replace existing 25 HP aerator motor o Verify motor is suitable for continuous-duty wastewater aeration service. o Motor requirements to match existing b) Bearing Repair and Service o Replace damaged or worn bearings. o Repack and lubricate bearings per manufacturer specifications. o Verify proper seating and load handling capability. c) Gear Drive Repair o Drain and inspect gear oil for contamination or metal particulates. o Replace worn gears, seals, and internal components as required. o Replace seals and gaskets to prevent leakage. o Refill with manufacturer-recommended lubricant. o Verify gear mesh alignment and torque transmission capability. d) Removal and Reinstallation o Disconnect and remove motor and drive components as required to perform repairs/replacement. o Perform precision alignment of motor-to-gear coupling. o Secure all components with manufacturer torque requirements. o All lockout/tagout procedures shall be strictly followed. The magnitude of this project is between $40,000.00 and $50,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$50,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
5
Bidding Soon
780
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2026

May 4, 2026

Project location map

Multiple Locations, Oxford, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.