Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 18, 2026 at 8:00 PM
Updated May 20, 2026
Demolition and site work for a water / sewer project in Bellevue, Washington. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.
Work contemplated to be performed under this contract includes: demolition of existing wastewater pump station and ancillary equipment and repurposing an existing wet well to a new manhole at the Cedar Terrace Apartments; constructing approximately 415 linear feet of 8-inch diameter D3034 PVC pipe and three manholes on the Cedar Terrace Apartments property using typical cut-and-cover trenching; restoring surface conditions, including grading and stabilizing of a new access road over the installed pipe on the Cedar Terrace Apartments property and asphalt pavement trench patching at Belkirk 520 and Evergreen Business Park; trenchless installation of approximately 250 linear feet of 8-inch diameter HDPE pipe with a minimum 14-inch diameter steel casing between the Cedar Terrace Apartments property and the Belkirk 520 property by horizontal directional drilling; installation of approximately 200 linear feet of 8-inch diameter PVC pipe and two manholes on the Belkirk 520 and Evergreen Business Park properties using typical cut-and-cover trenching; installation, monitoring, and removal of settlement monitoring elements; sanitary sewer bypass; dewatering; restoring surface conditions, including asphalt trench patching; tree removal and clearing; landscaping and site restoration; traffic control, as required for contractor's construction access; and other work as required to complete the project. Each bid shall be accompanied by a bid bond in the form of cash, certified check, cashier's check or surety bond in an amount equal to at least 5% of the amount of such bid. Supplemental Responsible Bidder Criteria will apply to this project. The City of Bellevue reserves the right to reject any and all bids and to waive irregularities and informalities in the bidding process. No bidder may withdraw their bid for a period of ninety (90) days after the date and time set for the opening thereof. The successful bidder must comply with the City of Bellevue equal opportunity requirements and Title VI of the Civil Rights Act of 1964. Question Deadline 03/30/2026 at 4:30 PM PT
Award
Water / Sewer
$1,996,996.00
Public - City
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
