BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2026 at 8:00 PM

Updated May 21, 2026

Site work and new construction of an educational facility in Flint, Michigan. Completed plans call for the construction of a educational facility.

This Project Specific Request for Qualifications (RFQ) is for Construction Management Services for the Michigan School for the Deaf - New Dormitory located at 1235 W. Court Street, Flint, MI 48503. Construction Management (CM) firms interested in providing preconstruction and construction management services are invited to submit their qualifications. Interested firms must submit one electronic copy of their Qualification Requirements response as specified. Responses will be evaluated by a Project Team and other Owner representatives to select firms to submit a technical proposal for Construction Management Services and participate in interviews if necessary. The technical proposal and interview, if conducted, will be evaluated to determine the best qualified construction management firm for the project. Submissions must be made electronically through the State of Michigan Procurement System (SIGMA VSS) as specified. No other forms of submission, such as facsimiles or e-mails, will be accepted. The response must be signed by an authorized official who can bind the firm to its provisions. It is the responsibility of the Construction Management firm to ensure timely and complete submission. Question Deadline 04/08/2026 at 2:00 PM ET Questions must be submitted in writing to Sheryl Ananich at ananichs@michigan.gov by this deadline. This questionnaire will be used by the Department of Technology, Management and Budget and an Ad-hoc advisory committee for the purpose of making an initial evaluation of Construction Management firms interested in providing Construction Management services for a new residential dormitory building at the Michigan School for the Deaf in Flint, Michigan. A Phase 100/200 Report with estimated cost was developed in 2023-24 (see attachment 1). A Phasing Plan and Schedule was completed in 2024 (see attachment 2) outlining proposed sequencing. The target site is on land not owned by the State of Michigan (SOM), through a lease agreement to the SOM. It is anticipated that a ground lease and site access agreement will establish site control for the project team by Summer 2026.

Post-Bid

Educational

$30,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
237
Bidding Soon
2,822
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

March 1, 2027

Project location map

1235 W Court St, Flint, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.