BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 16, 2026

Paving and renovation of a transportation facility in Idaho Falls, Idaho. Completed plans call for the renovation of a transportation facility.

Work associated with proposed improvements is generally described as follows: Schedule A - South Terminal Apron Reconstruction and Expansion: The project includes demolition of approximately 10,000 SY of existing asphalt apron pavement and reconstructing with 7,200 SY of concrete pavement and 4,600 SY of asphalt pavement, along with associated airfield electrical and storm drainage improvements. Schedule B - North Terminal Apron Reconstruction and Expansion, Deice Apron Construction: The project includes demolition of approximately 4,600 SY of existing asphalt apron pavement and reconstructing with 5,100 SY of concrete pavement and 12,800 SY of asphalt pavement, along with associated airfield electrical and storm drainage improvements. Schedule C - Terminal Apron Pavement Maintenance: The project includes 21,500 LF of concrete joint sealant removal and replacement and 2,100 LF of concrete pavement spall repair as well as repairs to concrete drainage structures within the work area. Schedule D - North Cargo Apron Reconstruction: The project includes reconstruction of approximately 4,500 SY of existing taxilane pavement. Schedule E - South Apron Stormwater Improvements: The project includes removal and replacement of approximately 1,365 LF of Reinforced Concrete Pipe and 3,000 CY of excavation for a detention pond. Schedule F - Deicing Effluent Storage: The project includes installing a 50,000 gallon HDPE in-ground holding tank for deicing effluent with a tank level monitoring system and the installation of 250 LF of storm pipe. A non-mandatory pre-bid conference for the Project will be held on Thursday, March 19th, 2026 at 2:30:00 p.m. local time at the Airport Conference Room at Idaho Falls Regional Airport, located at 2140 N. Skyline Drive, Idaho Falls, ID 83402. As an alternative option to attending the Prebid conference presentation portion in-person, a virtual meeting option is provided. Information to call in or join the virtual meeting with video is provided below Join by Phone Join with Video Toll-free number: +1 689-223-3081,,247225399# Meeting ID: 256 703 854 302 02 Conference ID: 467 864 500# Passcode: LF6b4T9N QA date - 3-27-2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Morgan Driever, mdriever@ardurra.com, (208) 323-2288 Questions received less than three (3) days prior to the date for opening of Bids may not be answered

Bid Results

Transportation Terminals

$11,964,269.00

Public - City

Paving, Renovation

76

24

9

7

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
21
Bidding Soon
168
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

June 1, 2026

Project location map

2140 N Skyline Dr, Idaho Falls, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.