Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 19, 2026 at 8:00 PM
Updated March 26, 2026
Site work for a municipal facility in Sandstone, Minnesota. Completed plans call for site work for a municipal facility.
Work Scope Description: Contractor shall supply lump sum cost to provide materials and labor for installation of a 8' galvanized chain link fence with barbed wire top as follows in the base bid. Contractor shall supply and install a chain link fence around the perimeter of the tower per the provided layout. Approximate fence perimeter totals 150 lineal ft. Contractor shall include a 14' swing wide gate. Unit cost per ft to install shall be provided in Bid Alternate #1 and will be used to calculate add or deduct based on actual install. See following product specifications. Fence will be 3 sided and tie into the existing fence at the Housing Warehouse. Contractor will be responsible for any damage they may cause to the existing fence. Contractor shall include the cost of any digging or other land alterations required to install fence. CHAIN LINK FENCING SPECIFICATIONS PART 1 - GENERAL 1.01 SCOPE The work included in this Section of the Specifications consists of furnishing all labor, equipment and materials, and in performing all operations in connection with the construction and installation of all chain link fencing, and gates in strict accordance with this project. PART 2 - PRODUCTS 2.01 MATERIALS All Exterior Fencing Rails: Provide top, intermediate and bottom rails shall be 1 5/8" o.d., schedule 40, (2.27 lb/ft) galvanized steel pipe. Eight-foot-high Corner Posts: Corner posts shall be 2 7/8" o.d., schedule 40, (5.80 lb/ft) galvanized steel pipe. Eight-foot-high Gate Posts: Gate posts shall be 4" o.d., schedule 40, (9.12 lb/ft) galvanized steel pipe. Eight-foot-high Posts: Posts shall be 2 3/8" o.d., schedule 40, (3.65 lb/ft) galvanized steel pipe. Fittings: All fittings shall be galvanized pressed steel. Tie Wires: Ties shall be 9 gauge aluminum as specified under installation. Barb Wire: All aluminum barbed wire is .110" dia. wire with four-point barbs of .080" dia. wire, 5052 H-38 main, 6061 T94 barb. Top Tension Wire & Barbed Wire (3 Strands) with triangular brace, commercial grade. Vertical arm. 9 Gauge Fabric: Wire: ASTM A 392 Standard Specification for Zinc Coated Steel Chain Link Fence Fabric, Type 2, Class 2. Wire shall have a breaking strength of 1290 lb/ft. Gates: Gate Posts: (See above) Gate Frames: Frame and mid-rail shall be 1 5/8" o.d., schedule 40, galvanized steel pipe at 2.72 lb./ft., welded at each corner. Gates shall have a positive type latching device with provision for padlocking and hinges as required to secure gate. Gate Hinges: Hinges for all gates shall be pressed steel Bulldog Industrial Hinges by Master Halco, Inc. or approved equal. Gate Latches: Latches for double gates shall be the Pioneer Industrial Gate Latch by Pioneer Semmerling (763-424-8383) or approved equal. Latches for single gates shall be Strong Arm Industrial Gate Latch by Hoover Fence Co. (800-355-2335) or approved equal. Fittings: All fittings shall be galvanized pressed steel. Tie Wires: Ties shall be 9-gauge galvanized steel. Braces: Braces shall consist of a mid-rail, 1 5/8" o.d. pipe, welded at each end. Bolts, nuts, washers and miscellaneous fasteners: Hot dipped galvanized steel. Barb Wire: All galvanized barbed wire is .110" dia. wire with four-point barbs of .080" dia. wire, 5052 H-38 main, 6061 T94 barb. Top Tension Wire & Barbed Wire (3 Strands) with triangular brace, commercial grade. Vertical arm. 2.02 MISCELLANEOUS MATERIALS All materials shall be new and of the best quality for the purpose intended. All tension bars, bolts and miscellaneous fasteners shall be hot dipped galvanized unless indicated otherwise. Bolts, nuts, washers and miscellaneous fasteners: Hot dipped galvanized steel. No plastic or fiberglass components are allowed on chain link fencing. PART 3 - EXECUTION 3.01 INSTALLATION Post Setting End, corner, line, pull, backstop, gate posts shall be set in concrete with a footing depth of 60". All posts shall be set in a straight line and plumb. Fabric Fastening and Stretching Install fabric according to ASTM F 567. The chain link fabric shall be securely fastened to all terminal posts by 1/4" x 3/4" tension bars with 9 gauge aluminum tie wires, spaced approximately 14" o.c., and to the line posts and rails with 9 gauge aluminum tie wires, spaced approximately 14" o.c. Both ends of all tie wires shall have, at minimum, a 360 degree turn around fabric wire. Clean-Up Upon completion of the installation, all debris created by the installation shall be removed or disposed of as directed by the owner or his representative. Additional Contractor Responsibilities: Contractor is responsible for field measuring all dimensions. Contractor is responsible for regrading and seeding any areas of the yard that they damage. Contractor shall include 0.5% TERO tax fee in base bid, if bid exceeds $25,000.00. Submission of receipt for paid TERO fee is required with application for final payment. Contractor shall be responsible for all required permitting and inspections. All fence materials shall be ordered upon receipt of approved contract and installed as soon as possible. The contract deadline to complete all work shall be June 30, 2026. Specified Product Substitutions: All proposed product substitutions must be approved by the Project Coordinator 5 days prior to bid. Any approved substitutions, will be made available to all bidders. Contacts: Interested bidders shall contact Keith Modglin by email at keith.modglin@millelacsband.com to be included on the bidder's list in the event that any addendums are issued for this project. Mobilization: The Contractor shall be capable of mobilizing his equipment and crews within seven days of the receipt of Notice to Proceed. Contractor shall provide means and methods for all building phases of construction. COMMUNITY DEVELOPMENT/PROJECT MANAGEMENT RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS FOR ANY REASON. COMMUNITY DEVELOPMENT WILL, TO THE GREATEST EXTENT FEASIBLE, GIVE PREFERENCE IN THE AWARD OF CONTRACT TO INDIAN ORGANIZATIONS AND INDIAN-OWNED ECONOMIC ENTERPRISES. Bidding notes: Submit proposal in lump sum (supply and install), not to exceed amount All Contractors (including subcontractors) must comply with Davis Bacon wage requirements. All Contractors are encouraged to provide the following along with their bid submittal: a. Comp d. A copy of Subcontractor/Material Suppleted & signed MLB Community Development Construction Bid Form (Required) b. A copy of Current MLB Vendor's License (or a copy of the submitted application) c. A copy of Current Insurance Certificatelier list e. A copy of valid State of Minnesota Contractor's License f. A copy of Authorized Signature Sheet (submitted with first bid submittal) All Contractors must comply with all Mille Lacs Band of Ojibwe American Indian Employment requirements (see 18 MLBSA 5). Contact TERO Office at (320) 532-4778.
Post-Bid
Municipal
$10,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 25, 2026
April 24, 2026
45700 Grace Lake Rd, Sandstone, MN
Related To This Project
Sandstone, MN
Bid Date: Feb 10 2026
Sandstone, MN
--
Sandstone, MN
Bid Date: Nov 21 2025
Sandstone, MN
Bid Date: Oct 28 2025
Sandstone, MN
Bid Date: Oct 01 2025
Sandstone, MN
Bid Date: Jul 28 2025
Sandstone, MN
Bid Date: Jun 19 2025
Sandstone, MN
--
Sandstone, MN
Bid Date: Apr 30 2025
Sandstone, MN
Bid Date: Apr 11 2025
Sandstone, MN
Bid Date: Apr 11 2025
Sandstone, MN
Bid Date: Jan 24 2025
Sandstone, MN
Bid Date: Nov 15 2024
Sandstone, MN
Bid Date: Nov 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.