BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 15, 2026

Demolition, site work and new construction of a playground / park / athletic field in Sandstone, Minnesota. Completed plans call for the demolition of a playground / park / athletic field; playground / park / athletic field; and 1,600-square-foot playground / park / athletic field.

The work will be done under one prime contract that includes: General, Mechanical, Demolition, Excavation, Civil, and Electrical construction. The project includes new construction of a seasonal campground shower restroom building (approximately 1,600 SF), removal of existing shower restroom building, slab and foundation system, and existing septic tanks mounds; modification to existing utilities; installation of a new gravel parking lot (7 standard and accessible stalls), two new water hydrants (bottle filler spigot) and associated piping. Site work includes demolition, excavation, erosion control, concrete pavement, water distribution system, mechanical and electrical systems, site preparation, and landscaping. Additional site improvements at the Campground and Day Use Areas (Site 1 and Site 2) include upgrades to 6 campsite spurs to meet accessibility requirements; at Day Use Area - Site 2, demolition of existing picnic area restroom building, slab and foundation system, and septic, expansion and improvement of existing parking lot (202 standard and accessible stalls), expansion and improvement of picnic area and trailheads for accessibility and landscape screening, installation of new vault toilet, and installation of two new water hydrants (bottle filler spigot) and associated piping; at Day Use Area - Site 1, establishment of new gravel parking lot along existing park road (12 standard and accessible stalls) and connection of new parking lot to existing trail. Site work includes demolition, grubbing, excavation, erosion control, water distribution system, site preparation, and landscaping. This solicitation includes required insurance as recommended for the project's specifications and scope of work. It is highly encouraged potential responders review Section 00 73 16 Insurance Requirements as well as AIA A201, Article 11 of the solicitation before submitting a response. This Project has been assigned a 3% Targeted Group (TG), Economically Disadvantaged (ED), or Veteran-Owned Small Businesses subcontracting goal. Responding company has completed as a Prime Contractor, not as a Subcontractor, the work for at least three contracts which have achieved Substantial Completion since May 1, 2023, for construction projects that involved similar project scope of work and size. Each of these contracts must have had a construction value of $1,000,000 or greater. Project Manager and Job Superintendent responsible for this project each has had at least five years of experience with work similar scope and value to this project. Each of these contracts must have had a construction value of $1,000,000 or greater. This project has a 3% Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) Small Business (TG/ED/VO) subcontracting goals established. SPK.00103.02.30.69 Question Deadline 05/14/2026 at 2:00 PM CT All questions should be submitted Est. Completion Date: Nov. 12, 2026

GC Bidding

Playgrounds / Parks / Athletic Fields

$2,467,908.00

Public - City

Demolition, New Construction, Site Work

85

26

19

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
72
Bidding Soon
590
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2026

July 20, 2026

Project location map

61101 Banning Park Rd, Sandstone, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.