BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 18, 2026 at 8:00 PM

Updated April 4, 2026

Site work and paving for a road / highway in Hebron, Wisconsin. Completed plans call civil work for a road / highway.

Cold or hot mix wedging and repaving for Schmidt Road. Specifications: Length approximately 13,137 feet, width 20 feet, crown wedging approximately 2,000 feet, base wedging over millings area approximately 300 feet, 4LT DOT asphalt mix, 2-inch overlay after wedging. Surface will be swept with tack applied. Butt joints must be milled. The Town of Hebron reserves the right to accept or reject any and all bids, or accept the bid deemed most advantageous to the town.

Post-Bid

Roads / Highways

$700,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
467
Active Projects
246
Bidding Soon
2,742
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2026

May 18, 2026

Project location map

Schmidt Road, Hebron, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.