BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a residential development in Springfield, Massachusetts. Completed plans call for the renovation of a residential development.

Project Riverview Video Surveillance. 17 Bldgs. One Site-riverview. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 04/01/2026 Any prospective bidder desiring an explanation or interpretation of the solicitation, specifications, drawings, etc., must request it at least 7 days before the scheduled time for bid opening. Requests may be oral or written SCOPE A. The Contractor under this section shall furnish all labor, materials, appliances and equipment necessary to perform all electrical work, complete in strict accordance with this section of the specifications and applicable drawings and subject to the terms and conditions of the contract. All equipment and materials shall be new. B. The work referred to under this division includes all labor, materials and equipment, rigging, and transportation for the satisfactory installation and completion of all work referred to herein and/or as may be shown on the contract drawings and not specifically mentioned in this division. C. The following schedule is part, but not necessarily all-inclusive, of the items in this division of the contract: 1. Unit pricing 2. Provide all excavation and backfill and reseeding of lawn. 3. Provide all excavation and backfill and new concrete paving and bituminous paving to match existing. 4. Furnish and install new circuit breakers in existing Panelboards 5. Furnish and install new branch circuits. The Project consists of the VSSI systems "Infrastructure", primarily new metal conduit EMT, RMC and cabling installations at 17 existing buildings: also coring & sealing, new duplex receptacles and circuits within existing Owners panels. The Project includes 3 new metal poles for new LPR's (License Plate Readers) surveillance cameras which will require excavation, backfill, seeding, U/G conduit & cable, and concrete pole bases. Construction substantial completion time is 90 calendar days.

Bid Results

Residential Subdivision

$107,300.00

Public - City

Renovation

23

10

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
979
Active Projects
560
Bidding Soon
5,791
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

May 8, 2026

Project location map

82 Division St, Springfield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.