BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a water / sewer project in Huntington, West Virginia. Completed plans call for the renovation of a 462-square-foot water / sewer project.

The Project Work includes but is not limited to the complete removal of the existing roof and wood deck assembly, installation of a new membrane roof system, metal roof deck and perimeter deck supports, framed roof openings, flashing, and accessories to complete the warrantable specified system. Bids shall be accompanied by a certified check or bid bond payable to the Huntington Stormwater Utility in an amount not less than five percent (5%) of the base bid. Bidders are required to have a West Virginia contractor's license per 21-11-11 of the WV Code. All elements of the Project shall meet Economic Development Administration (EDA) requirements, including, but not limited to, design requirements, bidding process, reporting, construction, grant administration, and documentation throughout the Project. All bidders must be "Equal Opportunity Employers" and comply with the appropriate provisions of State and Federal law. Federal Davis-Bacon Act wage rate determinations are inserted as part of the Bidding Documents and the requirements of which shall be incorporated into the Bid by the CONTRACTOR. If the construction Contract price exceeds $100,000, the Owner, EDA, the Comptroller General of the United States, the Inspector General of the Department of Commerce, or any of their duly authorized representatives, shall have access to any documents, books, papers, and records of the CONTRACTOR (which are directly pertinent to a specific grant program) for the purpose of making an audit, examination, excerpts, and transcriptions. The OWNER shall require the CONTRACTOR to maintain all required records for at least three (3) years after the OWNER makes final payment and all pending matters are closed. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Renovation

12

18

7

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
69
Bidding Soon
975
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2026

May 20, 2026

Project location map

11th Street Flood Pump Station Huntington, WV 25701, Huntington, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.