BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 20, 2026

Renovation and addition to a municipal facility in Spooner, Wisconsin. Completed plans call for the addition of a 6,824-square-foot, one-story above grade municipal facility; and 650-square-foot municipal facility.

Minority Goal 4% Women Goal 13% In general, the work consists of the construction of a 650 SF addition and level 2 alteration of the existing Spooner Ranger Station, creating a Northwest District Dispatch Office. The project includes an accessible toilet room, four dispatch stations and equipment, a kitchenette, a four-person meeting room, and electrical upgrades with an uninterrupted power supply by emergency backup generator. Work will include new HVAC, plumbing, and electrical to the addition and applicable alteration to the level 2 alteration spaces the addition will tie into. Base bids will be received as a single lump sum bid for plumbing, mechanical (heating, ventilating, air conditioning), and electrical. A bid guarantee in the amount of 10% of the bid must accompany each bid submitted. Only certified bidders by the Department of Administration are qualified to submit bids exceeding $100,000. All bids from contractors who are not certified will be rejected. Additional instructions and certification forms are available from the DOA website. The letting process uses a single prime bidding and contracting approach. The mechanical, electrical, plumbing, and fire protection (MEP) divisions of work will be bid and awarded first. The lowest, qualified, responsible, certified MEP bidders identified must be included in all general prime contractor bids. General prime contractor bids not including the successful MEP bids will be rejected. The state will contract with the lowest, qualified, responsible, certified general prime contractor, who will then subcontract with the successful MEP bidders. Bid Results : Plumbing A To Z Plumbing & Heating Inc. $56,544.00 Mechanical Paul's Sheet Metal, Inc. $68,494.00 Electrical TJ Electric, Inc. $225,800.00

Bid Results

Municipal

$350,838.00

Public - State/Provincial

Addition, Renovation

52

35

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2026

July 1, 2026

Project location map

810 W Maple St, Spooner, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.