BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 19, 2026

Site work and new construction of a water / sewer project in American Canyon, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The Zone 5 Pump Station Project (WA25-0200) is located in American Canyon, California along Canyon Estates Circle. The project consists of construction of a domestic and fire booster system housed in a split-faced CMU building. Project components also include site lighting, grading, asphalt paving, concrete work, hydro-pneumatic tank system, fencing, gates, controls, switchgear, standby diesel generator, domestic water service, emergency eye wash, drainage system, retaining walls, valves, fittings, supports, paintings and coatings, roll up doors, doors and frames, roofing, flashing, gutters, equipment pads, exhaust fans, among other items and appurtenances. For proposals submitted in person, the City Clerk's clock will be used to make the official determination of the time bids are submitted. No bid will be accepted from a bidder who is not licensed in the State of California as a Class A License, (licensed in accordance with the provisions of Division 3, Chapter 9, of the Business and Professions Code of the State of California). The successful Contractor will be required to furnish, with the Agreement, a Faithful Performance Bond in the amount of one hundred percent (100%) of the Agreement price and a Payment for Labor and Materials Bond in the amount of one hundred percent (100%) of the Agreement price. The successful Contractor will be required to furnish, prior to issuance of a Notice of Completion, a Warrantee Bond in the amount of ten percent (10%) of the final Agreement price. The successful Contractor shall also furnish Certificates of Insurance evidencing that all insurance coverage required by the CONTRACT DOCUMENTS has been so secured. Question Deadline 04/10/2026 at 5:00 PM PT Requests for information may be directed to the Public Works Department, Engineering Division, City of American Canyon, 4381 Broadway, Suite 201, American Canyon, CA 94503. For general information, call (707) 647-4588. All technical questions or requests for information may be submitted via e-mail to Edison Bisnar, Sr. Civil Engineer, at ebisnar@americancanyon.gov or electronically. The Contractor shall execute required documents within seven (7) calendar days after the Notice of Award; shall begin work within five (5) calendar days of issuance of the Notice to Proceed; and shall complete work within three hundred twenty (320) working days of issuance of the Notice to Proceed. The City Council reserves the right to reject any and all proposals, to waive any irregularities, and to award the contract to other than the lowest Bidder. No Bidder may withdraw their Contract Proposal for a period of sixty (60) days after the bid opening. Copies of the CONTRACT DOCUMENTS may be examined or obtained at the stated address herein.

Bid Results

Water / Sewer

$4,550,000.00

Public - City

New Construction, Site Work

114

58

2

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
454
Active Projects
196
Bidding Soon
3,670
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

June 22, 2026

Project location map

190 Canyon Estates Circle, American Canyon, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.