BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 16, 2026

Demolition, site work and new construction of a municipal facility in Lino Lakes, Minnesota. Completed plans call for the demolition of a municipal facility.

The scope of work consists of a new public works facility for the City of Lino Lakes. Bid Package No. 2 includes building demolition, earthwork, utilities, site furnishings, MEPs, and interior and exterior finishes. A bid security in the amount of 5% of the base bid is required. Envelopes containing bids must be sealed, marked City of Lino Lakes Public Works Facility – Bid Package #2, and indicate the Bid Category No. being bid. The name and address of the bidder must be shown on the outside of the envelope, along with the date and time of the bid. Combined bids including multiple bid categories will be accepted only if separate individual bids are also submitted. Each separate or combined bid must be submitted alone on a bid form and placed in separate envelopes. Bid Results :: Company name "Cleanian's LLC" was unable to verify. 1B - Surveying :: EVS $31,000 1C - Final Cleaning :: Cleanian's LLC $56,460 3C - Stain/Sealed Concrete :: The Concrete Guy $77,312 4A - Masonry :: Northland Concrete & Masonry $297,760 6A - Rough & Finish Carpentry :: Kellington Construction, Inc. $557,450 7A - Waterproofing :: Waterproofing by Experts $42,775 7B - Metal Panels & Canopies :: Architectural Panel Systems Inc. $424,888 7C - Roofing :: Lake Area Roofing & Construc$tio2n,1,7In4c,0.09 7D - Joint Sealants :: Carciofini $65,040 8A - Doors, Frames & Hardware :: Bredemus Hardware Co, Inc. $142,642 8B - Sectional Doors :: Miner Corporation $346,000 8C - Aluminum Framing and Glazing :: Ford Metro, Inc. $328,280 9A - Gypsum Assemblies :: Pinnacle Wall Systems $288,246 9B - Tile :: Lee's Ceramics Inc $69,780 9C - Acoustical Ceilings :: Twin City Acoustics $197,600 9D - Resinous Flooring :: Mavo Systems $12,495 9E - Carpet & Resilient Flooring :: Grazzini $44,835 9F - Painting :: Fransen Decorating, Inc. $315,327 10A - Specialties :: BMSI $48,619 10B - Metal Lockers :: H&B Specialized Products, Inc $69,470 10C - Operable Partitions :: Acoustic Associates $60,990 11B - Vehicle Fueling System :: Dan Larson Enterprises DBA Zahl-Petroleum Maintenance Co. :: $422,092 12A - Window Treatments :: Amy's Window LLC $28,813 14A - Vehicle Lifts :: Pump & Meter $279,792 21A - Fire Protection System :: Nova Fire Protection, Inc. $247,560 22A - Plumbing :: Kraft Mechanical LLC $1,457,000 22B - Vehicle Lube Systems :: Pump & Meter Service, $185,739 22A-23B - Combined - Plumbing Systems & HVAC :: Modern Piping, Inc. dba Modern $3,684,100 23B - HVAC & Hydronic Systems :: Muska Electric $1,834,477 26A - Electrical & Low Voltage Systems :: Neo Electrical Solutions :: $1,813,500 31A - Earthwork & Demolition :: Minnesota Utilites & and Earthwork :: $1,117,000 32A - Asphalt Paving :: Park Construction $345,495 32B - Site Concrete :: Ebert Inc dba Ebert Companies $312,000 32C - Landscaping and Irrigation :: L.A.C. Enterprises, Inc DBA Windsor Companies $331,558 32D - Fences and Gates :: Peterson Companies, Inc $474,700 32E - Synthetic Tennis Court Surfacing & Equipment :: Upper Midwest Athletic Construction Inc. $41,565 33A - Site Utilities :: Minnesota Utilities and Earthwork, LLC $383,034 31A-33A - Earthwork & Demolition - Utilities :: D&D Contracting, LLC $1,814,331

Bid Results

Municipal

$20,382,169.00

Public - City

Demolition, New Construction, Site Work

153

34

151

7

Subscribe For Documents

110 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
159
Bidding Soon
1,383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2026

May 15, 2026

Project location map

1189 Main St, Lino Lakes, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.