BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 23, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a road / highway in East Peoria, Illinois. Completed plans call for site work for a road / highway.

Sealed bids will be received for the Pinecrest Drive Pavement Patching - Phase III project. Pavement Removal, Special , Hot-Mix Asphalt Surface Removal, 2.5" , Combination Curb and Gutter Removal , Island Pavement Removal, Special , . P.C.C. Pavement Patch with Reinforcement, 9.5", Combination Concrete Curb and Gutter, Type B-6.24 , Bridge Approach Pavement , Hot-Mix Asphalt Surface Course IL 9.5 N50, 2.0" (Polymer Surface) , Polymerized Leveling Binder (Machine Method), IL-4.75, N50, 0.5" , Hot-Mix Asphalt Full Depth Pavement Patch, Inlet/Inlet Manhole Repair, Complete , Gas Valve Vaults to be Adjusted All bidders must be able to submit, if requested, an Illinois Department of Transportation Pre-qualification Statement prior to awarding the project. Failure to submit this statement within 24 hours of a request may result in rejection of the bid. Each bid must include two completed copies of the Bid Documents and a bid guarantee in the form of a bid bond, certified check, or cashier's check payable to the City of East Peoria, in the amount of five percent of the total bid. Failure to provide the required bid bond or check may be cause for bid rejection. Bids must be held good and may not be withdrawn for 60 calendar days from the due date. The project is subject to the Illinois Prevailing Wage Act. The City reserves the right to waive any irregularities and to accept or reject any or all bids if it is deemed to serve the best interest of the City. Contract Documents, including Drawings and Technical Specifications, are available for review at designated locations. Commencement of the work on the project may begin as early as May 6th, 2026. The project shall be substantially completed on or before July 3rd , 2026(The date of readiness for final payment shall be two weeks (14 calendar days) from the date of Substantial Completion and shall be in accordance with paragraph 14.07 of the General Conditions.

Award

Roads / Highways

$1,213,700.00

Public - City

Paving, Site Work

38

9

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2026

May 6, 2026

Project location map

Pinecrest Dr, East Peoria, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.