BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 21, 2026 at 8:00 PM

Updated May 22, 2026

Demolition, site work, paving and new construction of a fire / police facility in El Nido, California. Completed plans call for the construction of a four-room fire / police facility.

Bid date change as per Adda 5.The project will develop a new three-bay fire station with four dorm rooms, kitchen, living spaces, and administration areas. Site improvements will consist of new paving for driveways, drive aisles, parking, concrete sidewalks, landscaping, irrigation, trash enclosure, flagpole, and signage. The existing fire station shall remain operational for the duration of construction, with construction phasing required for the demolition of the existing fire station to complete construction of the apparatus bay accessory spaces. Sealed proposals must be received as described in the plans and specifications on file at the Department of Public Works. Proposals must be complete for the entire work, materials, and improvements, unless otherwise indicated. Bidders must possess either a Class A - General Engineering Contractor or Class B - General Building Contractor license at the time of bid and for the duration of the contract. Proposals must be accompanied by cash, cashier's check, certified check, or bid bond for not less than ten percent (10%) of the total bid amount as liquidated damages if the successful bidder fails to execute the contract and necessary documents within ten days of notification. A mandatory pre-bid walk is required. All proposals must be submitted on forms provided by the Public Works Director, sealed, and properly identified. Each bid must separately state prices for each item and the total contract price. No proposals may be withdrawn for 60 days after the bid opening. The County reserves the right to reject any or all proposals or parts thereof, and to waive errors or informalities. The project is subject to prevailing wage requirements, compliance monitoring, insurance requirements, and submission of certified payroll records. No contractor or subcontractor may be listed or awarded unless registered with the Department of Industrial Relations. The DBE Goal is Zero, however the use of DBE firms is encouraged. Submit bidder inquiries no later than five working days before bid opening in writing via email to: Lindsey Johnson Assistant Director of Public Works Lindsey.Johnson@countyofmerced.com

Award

Fire / Police

$6,129,633.00

Public - County

Demolition, New Construction, Paving, Site Work

152

28

10

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
103
Bidding Soon
1,203
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2026

July 6, 2026

Project location map

10537 State Hwy 59, El Nido, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.