BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of an office development in Weesaw Township, Michigan. Completed plans call for the renovation of a 50,000-square-foot office development.

The County of Marquette seeks proposals from qualified firms for construction services involving the removal and replacement of two condensing boilers at the 104 Building at KI Sawyer. The scope of work includes: 1. Removing and disposing of one Mod Con 399,000 BTU boiler and one Munchkin 399,000 BTU boiler, which have been isolated from the variable primary piping system. 2. Installing two 399,000 BTU Viessman Vitocrossal 200 CI2 floor standing condensing boilers or equivalent, with an ECM boiler circulator for each boiler. 3. Reusing existing 4" PVC for combustion and exhaust air. 4. Reusing the existing header and air separator, and installing necessary valving to isolate each individual boiler. 5. Installing a floor mounted chemical pot feeder for chemical additions as needed. 6. Installing low water cut-offs in accordance with manufacturer specifications. Proposals must use the provided Proposal Form (Exhibit A) and be submitted by mail or in person in a sealed envelope labeled "104 BUILDING BOILER REPLACEMENTS." Proposals will be publicly opened and read aloud. A pre-proposal meeting and site inspection will be held, and additional site visits can be scheduled after this meeting. Question Deadline 04/16/2026 All questions must be submitted in writing, via email or facsimile,

Bid Results

Office

$57,381.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2026

May 20, 2026

Project location map

104 Building at K.I., Weesaw Township, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.