Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 26, 2025 at 8:00 PM
Updated March 27, 2025
Site work and paving for a mixed-use development in Weesaw Township, Michigan. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
This is an invitation to bid for furnishing Labor, material, supplies and equipment to complete the project detailed on the Proposal and Contract Form and any attached specifications. The State reserves the right to award to the responsive and responsible bidder offering the best value to the State. Best value consideration may include the quality of service to be provided, conformity with specifications, or suitability to the requirements of the State, or to reject any and all bids in whole or in part if the best interest of the State will be served. Bidders are responsible for reading, understanding, and following Instructions To Bidders, General Conditions and General Requirements included in this Project Bid Package. Drew Montgomery / Phone: (269) 426-4013 / Email: montgomerya1@michigan.gov. Contact Drew Montgomery with questions regarding the sand relocation, locations, specifications, requirements, etc. Questions regarding the project: Site Contact/Project Manager's Name: Drew Montgomery Telephone: (269) 426-4013 E-Mail Address: MontgomeryA1@michigan.gov Division/Office Name: Parks and Recreation Field Unit Name: Warren Dunes State Park Park Headquarters Address (PRD only): 12032 Red Arrow Highway City, State, ZIP: Sawyer, MI 49125. Timeframe for work to be accomplished: April 13, 2025 - April 25, 2025 Scope of Work for Snow Fence Removal: o Remove the snow fence and metal posts from the beach area in a manner that will minimize damage for future use. o Roll up the fence. o Bring the metal posts up to the beach lots. o DNR staff will remove the fencing and posts from each beach lot area. Scope of Work for Sand Relocation: o Remove all sand accumulations from between the parking lots, from paved parking lots, behind parking lots number 1 and number 3, from the sidewalks, and from around the beach buildings. o The rows of sand should be smoothed out in the direction toward the lake. o The rows are not to exceed to the water's edge. o Clear the sand from the roadway behind beach lot #1 and beach lot #3. o The shoulder area behind each lot should be at least 15' of clearance. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.
Award
Playgrounds / Parks / Athletic Fields
$29,750.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
