Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 10, 2026 at 8:00 PM
Updated May 15, 2026
Renovation of an educational facility in Kenosha, Wisconsin. Completed plans call for the renovation of a educational facility.
All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $100,000. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of: the complete replacement of the existing glass, aluminum panel, and aluminum frame exterior curtain wall system. Interior acoustical panels which are attached to the curtain wall will also be replaced. In order to facilitate the work, an existing steel and aluminum canopy at the loading dock area must be removed and reinstalled. A minor amount of brick masonry removal and reinstallation is required for the canopy work NOTICE: The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Base Bids will be received as a single lump sum bid for: 5) Electrical. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Event Bid date Notes : Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703.
GC Bidding
Educational
$3,273,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2026
October 22, 2026
797 Wood Rd, Kenosha, WI
Related To This Project
Kenosha, WI
Bid Date: May 07 2026
Kenosha, WI
Bid Date: Jun 03 2026
Kenosha, WI
Bid Date: May 27 2026
Kenosha, WI
--
Kenosha, WI
--
Kenosha, WI
Bid Date: May 13 2026
Kenosha, WI
Bid Date: May 13 2026
Kenosha, WI
Bid Date: May 13 2026
Kenosha, WI
Bid Date: May 13 2026
Kenosha, WI
Bid Date: Jun 03 2026
Kenosha, WI
Bid Date: Jun 03 2026
Kenosha, WI
Bid Date: May 13 2026
Kenosha, WI
--
Kenosha, WI
--
Kenosha, WI
Bid Date: Apr 08 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
