BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a mixed-use development in Eau Claire, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

The work consists of approximately 1,120 lineal feet of street construction, including bituminous pavement removal, concrete curb and gutter removal, concrete sidewalk and driveway approach removal, water main and services, sanitary sewer and services, storm sewer, unclassified excavation, grading, preparation of subbase, crushed aggregate base course, concrete curb and gutter, concrete sidewalk, retaining wall replacement, concrete driveway approaches, bituminous pavement, and lawn restoration. Question Deadline 05/01/2026 For questions regarding this project contact the Purchasing office, 203 S. Farwell Street, P.O. Box 5148, Eau Claire, WI 54702-5148, telephone (715) 839-4957. SCOPE OF WORK Maple Street, Third Street to First Street. The construction of Maple shall consist of removal of bituminous pavement, removal of curb and gutter, removal of concrete driveway approaches, sanitary sewer and services, water main and services, storm sewer, unclassified excavation, preparation of subbase, crushed aggregate base, concrete curb and gutter, concrete sidewalk repair and new concrete sidewalk, concrete driveway approaches, sawing, asphaltic concrete pavement and lawn restoration. Cameron Street, Bellinger Street to Mappa Street. The construction of Cameron Street shall consist of removal of bituminous pavement, removal of bituminous driveway approaches, water main and services, unclassified excavation, preparation of subbase, crushed aggregate base, concrete curb and gutter, concrete sidewalk repair, concrete driveway approaches, sawing, asphaltic concrete pavement and lawn restoration. Mappa Street, Cameron Street to Madison Street. The construction of Mappa Street shall consist of removal of bituminous pavement, water main and services, sanitary sewer and services, storm sewer, unclassified excavation, preparation of subbase, crushed aggregate base, sawing, retaining wall replacement, asphaltic concrete pavement and lawn restoration.

Bid Results

Roads / Highways

$680,350.00

Public - City

Paving, Site Work

18

9

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
55
Bidding Soon
567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

May 25, 2026

Project location map

Multiple Locations, Eau Claire, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.