BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work and renovation of a mixed-use development in Groton, Connecticut. Completed plans call for the demolition of a transportation facility; for the renovation of a transportation facility; and transportation facility.

The project consists of: the removal & disposal of one (1) 4,000-gallon single wall fiberglass reinforced concrete underground fuel oil tank in front of the airport terminal building including the installation of a temporary 2,000-gallon rectangular aboveground fuel oil tank with connections to the terminal buildings existing boiler system. The project also includes the removal, disposal and replacement of a 1,000-gallon oil/water separator at the airport's maintenance facility. The contract time for completion of all work is within one hundred (100) calendar days from the date specified in the "Notice to Proceed". Clarification Deadline 4/16/2026 11:00 AM

Bid Results

Transportation Terminals

$525,000.00

Public - State/Provincial

Demolition, Renovation, Site Work

19

16

2

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
918
Active Projects
578
Bidding Soon
4,934
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 14, 2026

Project location map

155 Tower Ave, Groton, CT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.