BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 10, 2026 at 8:00 PM

Updated May 15, 2026

Site work and new construction of a mixed-use development in Welch, West Virginia. Completed plans call for the construction of a 600-square-foot, one-story above grade playground / park / athletic field.

The project consists of the construction of a new Linkous Pool Facility. The scope includes a 20-foot by 30-foot building with a 6-inch finished concrete floor and 12-inch by 15-inch concrete perimeter. Exterior walls will be 8-inch concrete block, 12 rows high, with vermiculite insulation in the blocks. The building will have a truss roof with 5/8-inch OSB sheathing and a metal roof, vinyl soffit, and metal in gables. Interior work includes an R-19 insulated ceiling with a 2-foot by 4-foot fire-rated drop ceiling and track, 2-foot by 4-foot LED flat panel lights, and 20-minute fire-rated doors. The building will feature two 4-foot by 4-foot front windows. Restrooms will include two showers and two ADA commodes in the women's restroom, and two showers, one ADA commode, and one urinal in the men's restroom. The scope also covers locker installation, connection to existing sewer and water systems, and a 6-foot by 6-foot room with an access window. The facility will have a 200-amp electrical service.

Award

Playgrounds / Parks / Athletic Fields

$84,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
52
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2026

June 8, 2026

Project location map

376 Linkous Park Road, Welch, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.