BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 21, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a road / highway in Winhall, Vermont. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project involves the paving of a section of Old Town Road, Benson Fuller Drive, and Pearl Buck Drive within the Town of Winhall during the 2025 paving year. The work on Old Town Road requires reclaiming and paving approximately 6,864 feet by 24 feet of road, including reclaiming the road at full depth, paving the base and top layers, and placing 2.5 inches compacted of type 2 (3/4") base mix and 1.5 inches compacted of type 4 top mix, both with staggered joints. A tack coat must be placed on the surface. The contractor is responsible for supplying a grader, final re-grading, and rolling upon approval by the Road Foreman. Twenty-two driveways in the area will require 8-foot aprons of specified sizes. The contractor must provide trucking and a shoulder machine and is responsible for compacting the shoulders. The Town will supply the shoulder material, loaded at 64 Old Town Road, and shoulders must be 12 inches wide and completed within two weeks of the paving completion. Proposals will be evaluated based on contractor experience, background, ability to perform the requested services, and price, with cost not being the sole determinant. E-Mail all submissions and direct all inquiries to: Lissa Stark, Winhall Town Administrator 115 Vermont Route 30, Bondville, VT 05340 Telephone: (802) 297-2119 E-Mail: townadmin@winhall.org

GC Bidding

Roads / Highways

$900,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
439
Active Projects
252
Bidding Soon
2,707
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

August 1, 2026

Project location map

Multiple Locations, Winhall, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.