BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a service station / car wash facility in Hamilton, Ohio. Completed plans call for site work for a service station / car wash facility.

The City of Hamilton, Ohio, is requesting proposals and statements of qualifications from a qualified EV Equipment provider or team of providers to contract with the City to provide electric DC Fast charging station equipment. The contracted firm will be required to provide DCFC (Direct Current Fast Charging) equipment for public use at four planned locations in the City of Hamilton. Installation of the equipment will be completed by the City's own team. The City reserves the right to reject any or all proposals, waive any informalities or irregularities, or accept any proposal deemed most favorable to the City. All questions should be posted to BidExpress. The deadline for questions is May 8th, 2026 at 2:00 PM Location - 801 South 8thStreet Hamilton , Ohio . (Hamilton Justice Center Parking Lot ) 421 Hamilton New London Rd . Hamilton , Ohio . (Potter's Golf Course Parking Lot ) 910 Cereal Ave. Hamilton , Ohio . (Kettering Hospital Parking Lot ) 1606 University Blvd. Hamilton , Ohio . (Miami University Parking Lot ) Capable of charging (4) vehicles simultaneously at site 1. - Capable of charging (4) vehicles simultaneously at site 2. - Capable of charging (4) vehicles simultaneously at site 3. -Capable of charging (4) vehicles simultaneously at site 4. - kW output of 100 kW or more while a vehicle is charging. - Must include (4) standalone DC Fast Chargers at each location (1 unit per parking stall). - Each proposed DCFC charging station must have the ability to support (1) SAE CCS 1 connector, and (1) North American Charging Standard (NACS) connector. -EV equipment capable of upgrading (adding more power modules - modular configuration) to scale in the future to a higher kW output (240kW) is preferred. - EV equipment must have network connectivity. -EV Equipment capable of connecting to the ChargePoint network is preferred. - EV equipment provider must be able to process customer usage, customer charges, and provide City of Hamilton with monthly payments. - EV equipment must provide the City of Hamilton with a reporting capability that includes but not limited to the following: # of customers, time of use, location of usage, length of charge time, kWh and or kW consumption - EV equipment provider must provide EV customer with call in support to EV drivers seeking assistance. -5 years of network required upfront. -5 years of warranty / maintenance plan purchased upfront to ensure 95% uptime - Each charging station must be capable of delivering 100 kW or more to a single vehicle (assuming the vehicle is capable of accepting such power input). - The station should be powered by 480-volt service. -All chargers should use Open Charge Point Protocol (OCPP) v1.6 or newer. -Networking should allow for collection of usage data and electronic payment from station users.

Post-Bid

Service Station / Car Wash

$800,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
114
Bidding Soon
1,409
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2026

June 15, 2026

Project location map

Multiple Locations, Hamilton, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.