BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Ketchikan, Alaska. Conceptual plans call for site work for a water / sewer project.

Harris Street's 855 feet of cast-iron water mains extending from Park Avenue to the end at 833 Harris were originally installed in 1956 and 1969. Since then, there has been no further progress replacing this fragile, old 6-inch cast-iron water main with 8- inch HDPE pipe. Including the corregated metal sewer pipe, both are long overdue for replacement with non-corrodible plastic pipe. This will be a joint venture between Public Works and KPU Water Division and the design of the Harris Street Utility Improvement Project will begin in 2026. In addition, Public Works is proposing to replace the Harris Street stacked rock retaining wall alongside Ketchikan Creek with a concrete structure. Municipal Assistance Funding will be sought and this would be a prime project to have already designed, submitted for ADEC approval, and gain maximum points. A preliminary cost estimate of construction is included. The project is included in the City's 2026-2029 Capital Improvement Program (CIP).As of April 28,2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$1,950,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
3
Bidding Soon
37
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2027

Project location map

Harris St, Ketchikan, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.