BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of a recreation facility in Clinton, Iowa. Completed plans call for the renovation of a recreation facility.

The project consists of removing and replacing the existing air handling unit (AHU) serving the Ericksen Center and providing new zone control through the installation of five new terminal air boxes (VAVs) with full integration into the existing Carrier i-Vu Building Automation System (BAS) via BACnet. If required during construction, the Contractor shall be responsible for providing temporary heating or cooling to maintain appropriate building conditions. An on site visit is required before the bid can be submitted. The low bidder must return the signed contract and performance bond, and will be required to sign a statement to comply with the City of Clinton's Safety Manual. Mechanical Scope of Work 3.1 Demolition and Removal o Disconnect and remove existing AHU, hot water coil, evaporator coil, refrigerant specialties, and associated components. o Disconnect existing supply air (S/A), return air (R/A), and outside air (O/A) ductwork as required. o Disconnect existing hot water supply/return piping from AHU to pipe branches off mains. o Disconnect existing refrigerant piping as required. o Remove and legally dispose of all demolished materials and equipment. 3.2 New Equipment Furnish and Install o Furnish and install new modular AHU, complete and operational. o AHU shall include new refrigeration specialties, new DX coil, draw-thru supply fan, and filter mixing box with 2" MERV 8 filters (or approved equal). o Provide all necessary transitions, fittings, supports, and sealing for reconnection to existing duct systems. Ductwork o Provide and install supply ductwork from AHU to each terminal air box (TAB/VAV) for five (5) zones. o Provide all duct fittings, transitions, hangers/supports, and sealing necessary for a complete installation. o Reconnect existing O/A and R/A ductwork to new AHU including transitions and gasketing/sealing as required. 3.4 Hydronic Piping and Hot Water Reheat o Provide and install five (5) new terminal air boxes (VAVs) with individual hot water reheat coils (one per zone). o Furnish and install new isolation valves for hot water supply and return as required for serviceability. o Furnish and install pipe, fittings, supports, and insulation for hot water supply/return piping serving all five (5) VAV reheat coils. o Furnish and install five (5) valve packages with actuators for VAV reheat coils. o Furnish and install balancing provisions (balancing valves/flow setters) and strainers as required to ensure proper flow and protect equipment. Question Deadline 05/20/2026 at 12:00 PM CT

GC Bidding

Amusement and Recreation

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
116
Bidding Soon
1,069
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2026

June 24, 2026

Project location map

1401 11th Ave N, Clinton, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.