BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 15, 2026

Demolition and site work for a water / sewer project in Duluth, Minnesota. Completed plans call for the demolition of a water / sewer project.

The West Odorous Air Biofilter Cell Replacement project generally consists of removing and replacing approximately 1,130 cubic yards of existing wood chips and 275 cubic yards of stone plenum from one of three biofilter cells (the west cell). Conditional work includes removing and replacing any perforated PVC air distribution piping and drain line that is broken. Questions regarding the bid documents should be directed to WLSSD attention: Bryce Radig (email: bryce.radig@wlssd.com).

Sub-Bidding

Water / Sewer

$300,000.00

Public - City

Demolition, Site Work

3

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2026

June 22, 2026

Project location map

2626 Courtland St, Duluth, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.