BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 27, 2026

Site work and paving for a road / highway in Viroqua, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work includes the full depth milling of the existing asphaltic surface on CTH V for a total of 2.3 miles. The existing asphaltic surface will be pulverized in full depth and reduced to a maximum size of two inches. The bid should include mobilization to the project and all equipment and labor necessary for the pulverizing operation and water injection, with the successful bidder supplying a pad foot roller. The county will supply operators for the pad foot roller. The general contractor will deposit the existing milled asphalt material back onto the roadway. County forces will shape and compact the roadway. The bid should also include the price for the contractor to final grade the product. Bidders should mail, hand deliver, or email their bids. Vernon County reserves the right to reject all bids, to accept any bid or any portion of a bid deemed in the best interest of the county, and to waive any bidding technicality or irregularity.

Post-Bid

Roads / Highways

$400,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
79
Bidding Soon
937
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2026

July 10, 2026

Project location map

1335 Railroad Avenue, Viroqua, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.