BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 10, 2026

Renovation of a military facility in Barksdale AFB, Louisiana. Completed plans call for the renovation of a military facility.

Site walk add/QA date change as per AMENDMENT 1 Provide all materials, labor, equipment, and services necessary to equip EOD Building 7625 with four fully functional, electrically controlled bay doors. Work includes removal of two existing interior compound bay doors and installation of two new 12-foot by 16-foot insulated rolling steel doors, as well as repair of two existing exterior compound bay doors by furnishing and installing required equipment and dedicated electrical circuits. All work shall be performed in accordance with the Statement of Work dated 20 March 2026 and shall comply with applicable Unified Facilities Criteria, International Building, Mechanical, Plumbing, and Electrical Codes, the Architectural Barriers Act, and NFPA Life Safety Code. The performance period for all required services is 60 calendar days. Questions must be submitted via email to the Contract Specialist and Contracting Officer listed below by 12:00 PM Central Daylight Time (CDT) on Tuesday, 19 May 2026. (2) Interior Compound Bay Doors: 1. Take-down existing (2) Bay Doors. 2. Replace both Bay Doors with (2) Cornell Cookson Model ESD 12'x16' Commercial Insulated Rolling Steel Doors. The Bay Doors shall have the following: a) Face/Surface Mount b) Interior Coil Weathered Thermistor c) 6F Insulated Slat d) 6F Slat 24/24 Gauge Galvanized Steel e) Gray Galvanized Steel with Front of Hood Mounted Motor Operators- MGH 7511 E Logic 3/4 HP 120/1/60 f) Auxiliary Chain and 3-Button Surface Mount Nema 1 wall stations for each door. G) Dedicated Controllers(2) Exterior Compound Bay Doors: 1. Furnish and Install on the (2) existing Bay Doors the following: a) (2) Lift Master Straight Arms b) (2) Lift Master Curved Arms c) (2) 24'' Operator Reinforcement Brackets Electrical: (2) Interior Compound Bay Doors 1. Furnish and install electrical components to allow both Bay Doors to be operated electrically. 2. The Contractor shall furnish and install the following: a) New 60 Amp 120/208v Single Phase MLO Panel. b) Connect electrical circuits from existing exterior panel to the new MLO Panel with new 60 Amp 3 phase breaker. c) (1) dedicated 120v circuit with conduit for each of the new Bay Doors. d) Connect electrical controllers for Bay Doors. (2) Exterior Compound Bay Doors 1. Furnish and install dedicated circuits for existing door controllers. 2. The Contractor shall furnish and install the following: a) Conduit b) Wire c) Breaker d) Control wire

Post-Bid

Military

$600,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2026

July 10, 2026

Project location map

To Be Determined, Barksdale AFB, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.