BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 8, 2026 at 8:00 PM

Updated June 11, 2026

Demolition, site work and asbestos abatement for a religious / funeral development in Hazleton, Pennsylvania. Completed plans call for the demolition of a 15,000-square-foot religious / funeral development; for site work for a religious / funeral development; and for asbestos abatement for a religious / funeral development.

Downtown Hazleton Alliance for Progress (DHAP) "Owner" is soliciting proposals from qualified contractors to perform the complete demolition and site restoration of an existing brick church structure. The building was structurally damaged by a fire in July of 2025 and has since been condemned by Hazleton City officials. The project includes full demolition of the structure, removal and disposal of all debris from site, including the proper removal of asbestos, removal of oil storage containers in the basement, disposal of contaminated soils, and full site stabilization to allow for future development of the property. The Contractor shall provide all labor, materials, equipment, permits, supervision, and coordination required to complete the work in a safe, compliant, and professional manner. SCOPE OF WORK 3.1 Pre-Demolition Activities o Site investigation and verification of existing conditions o Review of all environmental reports o Obtain all permits and approvals including the DEP 10 day notice for asbestos removal o Prepare and submit: o Site-Specific Health & Safety Plan (HASP) o Demolition Plan o Waste Management Plan 3.2 Hazardous Materials Abatement o Identification and removal of asbestos-containing materials (ACMs) in accordance with EPA, OSHA, DEP and state regulations o Air monitoring and clearance testing with DEP approved asbestos inspector present Basement Conditions: o Removal of oil storage containers, including: o Draining and proper disposal of tanks and oil o Assessment of potential soil contamination o Remediation if contamination is identified 3.3 Structural Demolition o Complete demolition of church structure including foundations o Removal of all interior and exterior elements o Dust, vibration, and noise control 3.4 Waste Removal o Segregation of hazardous materials as determined by Certified Asbestos Contractor and disposal of materials properly o Transportation and disposal at licensed facilities o Provision of all manifests and disposal documentation 3.5 Site Restoration o Backfill and compaction with suitable materials only o Rough grading o Full site stabilization o Clean and safe condition suitable for future development FUNDING SOURCE This project is being financed through a grant from the Commonwealth of Pennsylvania, Department of Community and Economic Development (DCED). Contractors shall comply with all applicable federal, state and local laws, regulations, and grant requirements associate with the funding source. The contractor shall comply with all applicable Pennsylvania labor laws and requirements pursuant to Article V(b)(11), including but not limited to: Pennsylvania Prevailing Wage Act Pennsylvania Construction Industry Employee Verification Act Pennsylvania Minimum Wage Act Pennsylvania Equal Pay Law Pennsylvania Wage Payment and Collection Law Pennsylvania Apprenticeship and Training Act PERIMETER PROTECTION AND SITE SECURITY The Contractor shall: Install secure perimeter fencing around the entire site prior to mobilization Maintain fencing for the duration of the project Provide controlled site access Install appropriate safety signage ADJACENT PROPERTY PROTECTION - HAZLETON LIBRARY The Contractor shall protect the adjacent Hazleton Library and nearby properties by: Conducting pre-construction condition surveys (photo/video) Implementing vibration monitoring Utilizing dust suppression methods Providing temporary structural protection if required Promptly addressing and repairing any damage REQUIRED COORDINATION The Contractor shall: Coordinate with the City of Hazleton for permits and inspections Coordinate with all utility providers for disconnects and protections Verify all utilities are safely terminated prior to demolition Maintain ongoing communication with municipal authorities Coordination with Certified Asbestos Contractor, hired by Owner BONDING REQUIREMENTS Performance Bond: 100% of contract value INSURANCE REQUIREMENTS Minimum coverage, including all subcontractors: General Liability: $2M per occurrence / $4M aggregate Umbrella Liability: $10M Workers Compensation: Statutory Employer's Liability: $1M Auto Liability: $1M Pollution Liability: $5M (must include asbestos coverage) DHAP shall be named as Additional Insured. CONTRACTOR QUALIFICATIONS Contractor must demonstrate: Experience with demolition of masonry/church structures Proven asbestos abatement experience Proper licensing Strong safety record (EMR, OSHA logs) References for similar projects PROJECT SCHEDULE Provide detailed schedule including: Mobilization Abatement Demolition Site restoration PROPOSAL REQUIREMENTS 11.1 Technical Approach Demolition methodology / schematic plan Abatement plan Safety procedures 11.2 Cost Proposal Lump sum pricing Breakdown: Abatement Demolition Disposal Site Restoration Unit rates for unforeseen conditions 11.3 Supporting Documents Licenses Insurance certificates Safety records References ADD ALTERNATE - HISTORIC PRESERVATION Provide a separate add alternate for preservation of historic elements, including: Stained glass Masonry or stone features - Woodwork or architectural elements Include: Method of removal and protection Storage or delivery assumptions Cost and schedule impacts The Contractor shall be responsible for ensuring compliance by all subcontractors performing work on the project. Certified payrolls, workforce documentation, and other compliance records shall be provided upon request. Failure to comply with applicable labor laws may result in withholding of payment, contract termination or other remedies available to the Owner. PROJECT SIGN: A project sign must be posted onsite during all activity stating This project was financed by a grant from the Commonwealth of Pennsylvania, Department of Community and Economic Development Questions Due Date: Jun 2nd 2026, 4:00 PM EDT

Post-Bid

Religious / Funeral

$100,000.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
509
Active Projects
268
Bidding Soon
3,394
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2026

July 10, 2026

Project location map

133 W Green St, Hazleton, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.