Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 6, 2026 at 8:00 PM
Updated June 10, 2026
Site work and new construction of a laboratory facility in Institute, West Virginia. Completed plans call for the construction of a 44,513-square-foot, two-story above grade laboratory facility.
Project no-860917.000 Construction Management at Risk (CMAR) Request for Proposals for the West Virginia State University Agricultural Laboratory. Project Scope The project consists of a multi-level building with an enclosed mechanical penthouse totaling approximately 45,000 gross square feet, including approximately 21,500 assignable square feet of laboratory, teaching, and collaboration space. The facility will require high-performance building systems, complex mechanical, electrical, and plumbing (MEP) infrastructure, specialty laboratory systems, and full commissioning. The building program includes: wet and dry teaching laboratories; food analysis and microbiology laboratories; food processing and product development space; agricultural and natural resources instructional laboratories; cybersecurity teaching and research space; and WVDA analytical laboratories for Agricultural Nutrition and Quality and PFAS/Chemical Residue testing. The project site encompasses approximately 2.75 acres (120,000 square feet) bounded by Avenue A, Barron Drive, and Fairlawn Avenue. Site work will include grading across approximately 17 feet of elevation change, utility modifications and extensions, access drives, pedestrian connectivity to campus, loading dock and service yard development, screening walls and gates, and modifications to existing parking and circulation. The service yard will accommodate an emergency generator, transformer, mechanical units, and staging for WVDA mobile training units. See Attachment F: Current Design Documents (Schematic Design Documents) for reference. The sole point of contact for this procurement is: Terra Oliver West Virginia State University 5000 Fairlawn Avenue Ferrell Hall Room 302, Institute, WV 25112 Email: terra.oliver@wvstateu.edu
GC Bidding
Laboratories
$35,000,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 19, 2026
January 1, 2027
Multiple Locations, Institute, WV
Related To This Project
Institute, WV
Bid Date: Jul 08 2026
Institute, WV
Bid Date: Apr 20 2026
Institute, WV
Bid Date: Jan 22 2026
Institute, WV
Bid Date: Nov 04 2025
Institute, WV
Bid Date: Jul 18 2025
Institute, WV
Bid Date: Mar 27 2025
Institute, WV
Bid Date: Dec 12 2024
Institute, WV
--
Institute, WV
Bid Date: Sep 05 2024
Institute, WV
Bid Date: Sep 17 2024
Institute, WV
Bid Date: Jul 12 2024
Institute, WV
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
