BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

Site work and paving for a road / highway in Spirit River, Alberta. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work site for this project is located within Saddle Hills County, northwest of Spirit River, approximately 3.25km north of Highway 49 / Spirit River Highway along Range Road 80. The project is within the vicinity of the following sections: E-1-79-8-W6M W-6-79-7-W6M NE-36-78-8-W6M The scope of work associated to the Township Road 790 & Range Road 80 Road Construction Project includes the following: Obliteration of approximately 700m of the existing Township Road 790 from ditch bottom to ditch bottom; Construction of approximately 700m of 8m gravel road top, rural cross section roadway along the obliterated alignment of Township Road 790; Construction of approximately 1,400m of 8m gravel road top, rural cross section roadway through farmland along the existing Range Road 80 road right-of-way; Working within a restricted work area – for this project, trespassing on the E-1-79-8- W6M and W-6-79-7-W6M is strictly prohibited. All work must be contained within the existing road right-of-ways and as permitted within the NE-36-78-8-W6M; Excavation of approximately 22,000m3 of material from a borrow area; Documents can be obtained from https://baseng.bidsandtenders.ca/

GC Bidding

Roads / Highways

$1,000,000.00

Public - County

Paving, Site Work

24

8

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2026

July 15, 2026

Project location map

Range Rd 80 & Township Rd 790, Spirit River, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.