Site work and paving for a civil project in Sidney, Montana. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and bridge / tunnel.

Proposed Work Consists of 0.0000 Miles of Pipe Replacement, Temporary Bypass, Mill & Overlay Located Nd 16, 4.2 Miles South of Jct Nd 68 And Involves Approximately: 1 L Sum Contract Bond; 303 Sy Removal of Bituminous Surfacing; 2 Ea Removal of End Section-all Types & Sizes; 124 Lf Removal Of Culverts-all Types & Sizes; 1 Ea Removal of Temporary Bypass; 285 Cy Topsoil; 775 Cy Borrow-excavation; 34 M Gal Water; 1 Acre Seeding Class Ii; 2 Acre Soil Stabilization; 54 Sy Ecb Type 2; 2275 Lf Fiber Rolls 12in; 1050 Lf Remove Fiber Rolls 12in; 899 Ton Traffic Service Aggregate; 266 Ton Aggregate BASE Course Cl 5; 335 Sy Milling Pavement Surface - 2 Inch; 169 Ton Commercial Grade Hot Mix Asphalt; 1 L Sum Mobilization; 40 Mhr Flagging; 1174 Unit Traffic Control Signs; 1 Ea Portable Rumble Strips; 6 Ea Type Iii Barricade; 12 Ea Delineator Drums; 42 Ea Tubular Markers; 32 Ea Stackable Vertical Panels; 40 Sf Obliteration of Pavement Marking; 125 Sy Geosynthetic Material Type G; 38 Lf Pipe Conduit 24in-approach; 124 Lf Pipe Conduit 48in; 1 Ea Manhole 72in; 15.24 Lf Manhole Riser 72in; 245 Lf Temporary Fence; 200 Lf Fence Remove & Reset; 2 Ea Object Markers - Culverts; .1 Mile Sinusoidal Rumble Strip - Asphalt Shoulder; .1 Mile Sinusoidal Rumble Strip - Asphalt Centerline; 52 Lf Short Term 6in Line-type Nr; 464 Lf Pvmt Mk Painted 6in LINE. Bid Range $200,001 to $400,000 Prequalification is required for all bidders submitting a bidding proposal form. Prequalification is required annually. Prequalified contractors who wish to renew their prequalification must submit a complete "Contractor's Prequalification Statement" by July 1 of each calendar year. Bidders who are not currently prequalified must submit a complete "Contractor's Prequalification Statement" at least 10 business days prior to the date of the bid opening. Information is available from the Construction Services Division of the North Dakota Department of Transportation. Contractor's License--A contractor is not required to have a license from the state of North Dakota before bidding on any project, however, no contract will be awarded unless said contractor holds a current North Dakota license in the class within which the value of the contract falls. The right is reserved to reject any and all proposals, to waive technicalities, or to accept such as may be determined to be for the best interests of the state. NDDOT - 24808 - Pipe Replacement, Temporary Bypass, Mill & Overlay - ND 16 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Water / Sewer

$400,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
7
Bidding Soon
139
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2026

August 3, 2026

Project location map

ND-16, Sidney, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.