BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2025 at 8:00 PM

Updated October 28, 2025

Site work for a water / sewer project in Sidney, Montana. Completed plans call for site work for a water / sewer project.

**As of August 20, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** THE PROJECT GENERALLY CONSISTS OF THE FOLLOWING WORK: o PHASE 2 | SCHEDULE 1 - ELEVATED WATER TANK INSTALLATION: Installation of a 750,000-gallon elevated, welded steel, water tank (spheroid). Work will include, but not limited to, elevated welded-steel spheroid tank structure & painting, foundation design and installation, concrete vault, interior control building, pipe, appurtenances, and equipment, cathodic protection, SCADA control system, electrical, site improvements, and security fence. The new water tank is situated approximately 120-feet east of the existing water tank. The work shall be substantially complete by no later than Friday, October 2, 2026. Qualifications: Water Storage tank designer/manufacturer and installer shall meet qualifications requirements specified in SECTION 33 16 19 ELEVATED SPHEROID STEEL WATER STORAGE TANKS of the Contract Documents. o PHASE 2 | SCHEDULE 2 - ELEVATED WATER TANK DECOMMISSIONING, REMOVAL, AND DISPOSAL: Decommissioning, removal, and disposal of the existing 300,000-gallon elevated water tank. Work will include, but not limited to, decommissioning of the existing elevated water tank, removal of electrical service, and removal/abandonment of existing water supply main to the distribution system; removal and disposal of the above-ground structure including lattice supports and reservoir. The existing concrete foundation will be left in-place. Portions of the tank structure are coated with lead-based paint and shall be handled and disposed of in accordance with local, state, and federal regulations. The existing water tank is situated approximately 120-feet west of the new water tank. The work shall be substantially complete by no later than Friday, October 2, 2026. o NOTE: This Project is part of a multi-phase project that will include installing/replacing water mains adjacent to North Park that will service the new elevated tank and future park/site restoration within North Park. These portions of work will be bid and awarded under separate contracts and are not included within this bid package. Refer to SECTION 01 11 00 SUMMARY OF WORK of the Contract Documents for additional detail. Est. Value Notes: For Schedule 1, $4.7M to $5.7M as the estimate. For Schedule 2, $600,000 to $800,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (4.4%), WBE (6.9%) Question deadline - 12 June 2025 Questions received less than five (5) days prior to the date for opening of Bids may not be answered

Award

Water / Sewer

$6,195,000.00

Public - City

Site Work

69

28

15

11

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
14
Bidding Soon
72
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

July 24, 2025

Project location map

To Be Determined, Sidney, MT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.