Published March 17, 2025 at 8:00 PM

Updated March 19, 2025

Site work for a civil project in Sidney, Montana. Completed plans call for site work for a water / sewer project.

The Project Generally Consists of the Following Work: o Phase 1 | Schedule 1 - Water Main Installation: +-490 Lf of 12-inch Pvc and +-400 Lf of 8-inch Pvc Water Main Installed via Open-cut Methods Through Residential Streets Within the City of Sidney, Montana. Work Will Include Typical Water Main Appurtenances Including, but Not Limited to, Fire Hydrants, Gate Valves, Fittings, Residential Water Service Installations, and Surface Restoration. The Work Shall Be Substantially Complete by No Later Than Friday, October 3, 2025 or Within 60 Calendar Days From the Notice to Proceed for Schedule 1, Whichever is Sooner. A Substantial Completion Will Be Issued Upon Completion of Phase 1 | Schedule I - Water Main Installation. Phase I | Schedule 2 - Water Main Installation May Not Proceed Until Spring of 2027. o Phase 1 | Schedule 2 - Water Main Installation: +-415 Lf of 12-inch Pvc and +-60 Lf of 8-inch Pvc Water Main Installed via Open-cut Methods Through Residential Streets Within the City of Sidney, Montana. Work Will Include Typical Water Main Appurtenances Including, but Not Limited to, Fire Hydrants, Gate Valves, Fittings, Residential Water Service Installations, and Surface Restoration. Phase I | Schedule 2 - Water Main Installation May Not Proceed Until Spring of 2027. Notice to Proceed for Schedule 2 Will Be Issued No Sooner Than Monday, April 5, 2027. The Work Shall Be Substantially Complete by No Later Than Friday, June 25, 2027 or Within 45 Calendar Days From the Notice to Proceed for Schedule 2, Whichever is Sooner. Pending Completion of the New Water Storage Tank, Bid and Awarded Under a Separate Contract, Work May Be Eligible to Begin in the Fall of 2026. o Note: This Project is Part of a Multi-phase Project That Will Include Replacing the Existing Elevated Water Storage Tank With a New Spheroid Water Storage Tank and Park/site Restoration Within North Park. These Portions of Work Will Be Bid and Awarded Under a Separate Contract at a Later Date and Are Not Included Within This Bid Package. There will not be a pre-bid conference. ** doc info : For technical questions or inquiries about obtaining paper copies of bidding and contract documents please contact the office of record at (406) 433-5617.

Award

Water / Sewer

$1,351,524.00

Public - City

Site Work

26

18

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
9
Bidding Soon
58
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

October 3, 2025

Project location map

Multiple Locations, Sidney, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.