Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 10, 2026 at 8:00 PM
Updated June 11, 2026
Site work and paving for a road / highway in Pardeeville, Wisconsin. Completed plans call for site work for a road / highway.
The Town of Pacific is soliciting separate bids for new asphalt on the following roads: Patchin Rd (2,252' x 20'), Donlin Dr. (620' x 22'), Wealthy Court (700' x 22'), Columbia Dr. (1,020' x 20'), and Dunning Dr. (1,310' x 20'). Work includes 1.75" Binder and 1.75" Surface 4MT58-28S asphalt layers, recycled asphalt shouldering, and all pavement preparation costs such as pulverizing with fine grade, removing weeds, cleaning, sweeping, providing tack coat, saw cutting driveways, and proof rolling. Traffic control is required. Only experienced equipment operators must be used. The contractor must provide a Certificate of Liability Insurance and complete the work by September 1, 2026. Sealed bids must be submitted to Pacific Town Hall by the specified deadline. The Town reserves the right to reject any or all bids, accept the most advantageous bid, or waive any technicality.
Sub-Bidding
Roads / Highways
$300,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2026
July 31, 2026
To be determined, Pardeeville, WI
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
