Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 7, 2026 at 8:00 PM
Updated July 9, 2026
Site work for a water / sewer project in Warrenton, Oregon. Completed plans call for site work for a water / sewer project.
Work will involve construction and commissioning of wastewater treatment facility additions and modifications. The City of Warrenton will receive electronic proposals for Construction Manager General Contractor (CM GC) services to perform work for the Warrenton Wastewater System Improvements Project. Construction of the Warrenton Wastewater System Improvements Project - Treatment Plant will include: Construction of new structures on existing site and/or within the footprint of an existing biosolids lagoon. Work involves quantification, removal, dewatering, and disposal of biosolids and modification to existing lagoon, including new berm construction. Rehabilitation of existing solids piping and valves for lagoons. Expansion of a sequencing batch reactor system, including a fourth basin, basin cover, pumps, blowers, aeration system, and piping modifications. (Note this differs from the "recommended alternative" from the 2024 Facility Plan.) Installing covers for and potential modifications to three existing sequencing batch reactor basins. Construction of an equalization tank with pumps and a cloth media disk filter for tertiary treatment. (Note this differs from the "recommended alternative" from the 2024 Facility Plan.) Potential modifications to existing open-channel UV system and utility water system. Construction of a septage receiving station, including storage and conveyance to treatment plant. Replacement and relocation of standby generator. Improvements to existing Influent Building and headworks system. General site improvements including paving and relocation of fence and gates. Improvements will be constructed within the approved budget and according to the approved project schedule. The existing wastewater treatment plant must remain fully operational and in continuous service for the entire duration of construction. The project is currently in the predesign phase and a Preliminary Design (Basis of Design) Report and Geotechnical Investigation are under development. The Warrenton Wastewater Facility Plan dated 2024 and a preliminary site layout are provided as part of the RFP.
GC Bidding
$10,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
NE 5th St, Warrenton, OR
Related To This Project
Warrenton, OR
--
Warrenton, OR
--
Warrenton, OR
Bid Date: Jun 18 2026
Warrenton, OR
Bid Date: May 21 2026
Warrenton, OR
Bid Date: Apr 29 2026
Warrenton, OR
--
Warrenton, OR
Bid Date: Jun 17 2026
Warrenton, OR
Bid Date: Jun 16 2026
Warrenton, OR
Bid Date: May 06 2026
Warrenton, OR
Bid Date: Feb 26 2026
Warrenton, OR
Bid Date: Feb 12 2026
Warrenton, OR
Bid Date: Mar 06 2026
Warrenton, OR
Bid Date: Jan 29 2026
Warrenton, OR
Bid Date: Jan 27 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
