BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 6, 2026 at 8:00 PM

Updated July 9, 2026

Site work and paving for a road / highway in Orwigsburg, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Road Program project will consist of Cold-in-Place Recycled Base Course with Emulsified Asphalt and Wearing course overlay, or alternate bid of full-depth asphalt milling and overlay of S. Liberty Street in Orwigsburg Borough. The items of work are identified more specifically in the Project Specifications. The entire project will be awarded to one (1) Contractor. The contractor shall complete on-grade construction and material processing for Cold-in-Place Recycled Base Course with Emulsified Asphalt and Portland Cement Additive, 5" Depth along S. Liberty Street from the intersection of Ridge Road to the intersection of W. Market Street an average of 30' wide. ALL WORK SHALL BE DONE ACCORDING TO PENNDOT PUBLICATION 408 SECTION 341. After Cold-in-Place Recycling has cured, contractor to place Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, <0.3 Million ESALs, 9.5 MM mix, 1.5" depth. 4" Yellow Waterborne Pavement Markings to be painted along centerline of roadway full length of the project limits (Double Yellow). Install grade adjustment for manholes and water valves as directed by Borough Representative. No proposed work is permitted within the PennDOT right-ofway within the lanes/shoulders of W. Market Street (SR 443). Contractor Work shall include the following incidental items: shoulder backup; sweeping of roadway; tack coating; milling of paving notches, drives, approaches and curb reveals; and sealing of joints and utilities. Contractor to properly dispose of milled/excavated material. Maintenance and Protection of Traffic is to be completed by the Contractor and is incidental to all items of work. Contractor to ensure S. Liberty Street remains open at all time during the full duration of construction. Orwigsburg Borough will complete the painting of crosswalks and parking stalls to match existing. See Attachment 1-A for additional information related proposed grades. A certified check or bank draft, payable to the order of ORWIGSBURG BOROUGH, negotiable US Government Bonds (at par value), or satisfactory Bid Bond executed by the Bidder and acceptable surety in the amount of 10% of the Total Bid of construction shall be submitted with each bid. The SUCCESSFUL BIDDER will be required to furnish and pay for satisfactory Performance and Payment Bond, each in the amount of 100% of the Contract Price with a corporate surety approved by the Owner. Question Deadline 07/01/2026 at 12:00 PM ET Online Portal . The Owner reserves the right to waive any informality or to reject any or all items or portions thereof or to waive any technicalities and informalities in the bid for the best interest of the Owner. Estimated Contract Value: $160K - $200K *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contractors must be PennDOT prequalified

Post-Bid

$200,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
528
Active Projects
31
Bidding Soon
3,338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

Multiple Locations, Orwigsburg, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.